My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008577
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000267
>
SU0008577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:34 AM
Creation date
9/5/2019 11:09:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008577
PE
2611
FACILITY_NAME
PA-1000267
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
TRACY
APN
20917003
ENTERED_DATE
1/7/2011 12:00:00 AM
SITE_LOCATION
18500 S HENDERSON RD
RECEIVED_DATE
1/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\APPL.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\CDD OK.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\EH COND.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Prior to the beginning of the final design of the subdivision, the Applicant and the <br /> Public Works Director shall consult with Tracy Fire regarding emergency access to <br /> the proposed development. Any requirements for emergency access shall be <br /> approved by MHCSD. <br /> 50. Except where allowed otherwise by the MHCSD, the grading of the project shall be such that <br /> all storm water runoff shall drain to public streets, public alleys, Mountain House Creek, or <br /> drainage facilities within easements for storm drainage purposes. Runoff across property <br /> lines to adjacent private property(not including alleys that have storm drainage facilities <br /> maintained by the MHCSD or a homeowner's association) will not be allowed. <br /> 51. The minimum arterial improvements, outside of the tentative map boundaries, as described <br /> herein, shall be constructed as necessary to serve the proposed development or phases of <br /> development, as determined by MHCSD. <br /> 52. All buildings shall be wired per specifications in the"Low Voltage Construction Pre-wire <br /> Guidelines"and other specifications provided by the MHCSD, and in accordance with the <br /> latest version of the MHCSD Technology Master Plan. <br /> 53. Sound walls, meeting the design requirements contained in the MHCSD Design Guidelines, <br /> shall be installed on arterial streets (except for Central Parkway) and collector streets when <br /> the adjacent development (or phased development) has lots backing onto the street. The <br /> length of the sound wall shall match the total length of the lots backing onto the street plus an <br /> additional length that will close a gap to a previously constructed wall not more than 200 feet <br /> away or to the end of the first block. <br /> 54. The sound walls shall be constructed consistent with the MHCSD Design Manual, the Master <br /> Plan and as shown on the preliminary sound wall plans. The noise barrier may consist of a <br /> wall, berm, or combination thereof, the exact location, height and character of the sound <br /> barrier shall be determined by a noise consultant approved by the County and the MHCSD. <br /> The sound study shall comply with the Neighborhood K& L Initial Study Sound Study. <br /> 55. Except when the MHCSD General Manager specifies otherwise, when a sound wall is <br /> installed on an arterial street, the adjacent street edge landscaping, sidewalk, and street curb <br /> & gutter shall also be installed. <br /> 56. Construction Traffic shall comply with the Construction Truck Management Plan administered <br /> by the MHCSD. Project construction plans shall include specifications to the contractor <br /> outlining compliance requirements. <br /> 57. To control erosion and sedimentation during project construction and operation, the <br /> developer shall comply with MHSWMP policies, MHSWMP mitigation measures, and Phase I <br /> and II NPDES permit requirements, including the preparation and implementation of a <br /> SWPPP that outlines BMPs to be followed to minimize erosion and sedimentation during <br /> project construction and operation. The Developer shall have qualified NPDES personnel on <br /> site. The developer shall pay all cost associated with the implementation and inspection of <br /> these requirements. <br /> 58. The developer shall build the required drainage system and water quality basins as required <br /> by MHCSD to accommodate runoff from the project. <br /> 59. Water Quality Basins Mosquito Abatement: Plans for the implementation and maintenance of <br /> the water quality basins and any other storm drainage facilities involving open bodies of water <br /> shall be reviewed and approved by the MHCSD and if required by the Mosquito Abatement ,../ <br /> District. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.