Laserfiche WebLink
MOUNTAII—)USE NEIGHeORHOODs KAND L INITIAL STUDY APPENDIX A <br /> MOUNTAIN HOUSE MASTER PLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> Person/ Timingor <br /> Monitoring Agency Frequencyof <br /> Impact, Mitigation Measure Requirements Responsible" Monitoring^ <br /> Many of the mitigation measures from the Final Environmental Impact Report have been incorporated into the Master Plan,Master Plan Appendices,Specific Plan I,and Public Financing Plan. Some mitigation <br /> measures have been included as Amendments to the San Joaquin County General Plan andfor the Mountain House Development Title. Compliance with these mitigation measures will occur as a function of the <br /> Implementation of these various plans. <br /> WATER SUPPLY <br /> MC4.1.1 a)If potential or proposed restrictions on diversion would cause the confirmed water supply Review of SJCDPW SP <br /> Inadequate raw water storage facilities may to be insufficient to serve the project as proposed In the Master Plan,then the specific plans Subsequent Specific <br /> result in intern pilon of water service,especially shall identify additional water conservation/reuse measures to be incorporated into the Plans, <br /> if restrictions on water diversion were imposed by project to ensure that the demand would not exceed the confirmed supply. <br /> State or Federal agencies <br /> M4.4.1.5 a)Industrial reuse of water treatment sludge shall be practiced to the maximum extent Plan review. MHCSD,SJCDPW DP for water <br /> Water treatment sludge disposal could adversely possible.The Community Service District shall consider other disposal options only if treatment plant <br /> impact local water quality or unnecessarily industrial reuse were Infeasible, <br /> occupy scarce landfill space <br /> M4.4.1.6 a)Chemical Selection and Facilities.Prior to the plants,chemicals associated with water Review MHCSD,SJCDPW DPs for water and <br /> An uncontrolled release of hazardous materials and wastewater treatment operations shall be carefully selected to minimize the hazard. Plan/Engineers waste-water <br /> associated with water treatment practices could Chemical handling and storage facilities shall be designed to minimize and effectively Report treatment plants <br /> potentially occur and Impact water resources and mitigate the potential for accidental releases,including such features as secondary <br /> public health containment alarms remote sensing instruments and other safety features <br /> WASTEWATER <br /> M4.4.2.1 a)Additional wastewater treatment processes shall be provided if unrestricted use Plan review. SJCDPW SP <br /> Inadequately treated reclaimed wastewater could reclamation,including irrigation on-site,industrial/commercial reuse,or surface water <br /> impact local surface and groundwaters and discharge were implemented <br /> public health. Insufficient reclamation sites could b)The permit application for the wastewater treatment plant shall include a schedule for Review Development SJCDPW DP for treatment <br /> result In illegal and inappropriate discharge of design,construction,and permitting for the plant to ensure that the wastewater treatment Permit application. plant <br /> treated wastewater. and reclamation facilities would be operational prior to the approval of the first final <br /> subdivision map <br /> c)Each Development Permit for the wastewater treatment plant shall describe the Review Development SJCDPW DP for treatment <br /> mechanism by which the construction of additional facilities for incremental expansion in Permit application. plant <br /> treatment capacity shall be completed before the existing capacity is exceeded <br /> l+irzvi rt A-3 <br />