Laserfiche WebLink
APPENDIX A MOUNTAIN HOUSE NEIGHBORHOODS K AND L INITIAL STUDY <br /> Personl Timing or <br /> Monitoring Agency Frequency of <br /> Impact Mitigation Measure Requirements Responsibleb Monitoring- <br /> d)Specific plans subsequent to Specific Plan I shall include a comparison of the actual Plan Review. SJCDPW SP <br /> wastewater generation rates for the project with that calculated in the Master Plan. If <br /> wastewater flow rates were higher than those predicted in the Master Plan assuming <br /> Implementation of water conservation measures,then the next specific plan shall specify <br /> actions that would be implemented in the next specific plan to reduce the wastewater <br /> generation rates. Approval of the specific plan(s)shall be contingent on theadequacy of <br /> the proposed actions to reduce wastewater generation rates to those calculated in the <br /> Master Plan If appropriate <br /> e)If sufficient off-site land cannot be secured for off-site reclamation,then on-site Plan RevieWISP. SJCCOD,SJCDPW DP/SP <br /> reclamation shall be practiced to the maximum extent possible. Other disposal options, <br /> including discharge to Old River and piping the effluent to non-contiguous lands for <br /> Irrigation,shall be considered,if necessary. If future specific plans propose an interim or <br /> permanent wastewater reclamation at a site other than the sites identified in the Master <br /> Plan,all the policies in the Master Plan and all the adopted mircation measures,shall be <br /> applicable to the proposed alternative reclamation site(s). Any alternative wastewater <br /> reclamation site shall also be subject to the permitting requirements of the Central Valley <br /> Regional Water Quality Control Board and the Department of Health Services. Prior to the <br /> approval of any specific plan utilizing an alternative wastewater reclamation site not <br /> specifically Identified In the Master Plan/Specific Plan I EIR,site-specific environmental <br /> review shall be performed(including but not limited with respect to human contact, <br /> biological impact,crop types,etc.)and additional mitigation measures will be adopted to <br /> mitigate any site specific environmental impacts not previously addressed. - <br /> fl A detailed Salt and Trace Metal Management Plan shall be submitted as part of the Review reclamation SJCDPW DP for wastewater <br /> reclamation plan to ensure that irigatlon with reclaimed water is a viable long-term disposal plan. treatment plant <br /> option and to ensure minimization of salts and trace metals that are discharged to surface <br /> waters via the agricultural drains. <br /> g)The location and design specifications for the wastewater storage ponds shall be Review reclamation SJCDPW DP for wastewater <br /> provided In the Reclamation Plan.The location of agricultural drains within a one-half mile plan. treatment plant <br /> radius of the storage ponds and the sources and characteristics of soil that would be used <br /> to construct the ponds shall be identified.The design specifications shall address levee and <br /> and bottom permeability,levee stability,and flood protection, <br /> rrrrzvrr <br /> A-1 <br />