Laserfiche WebLink
APPENDIX A MOUNTAIN HOUSE NEIGHBORHOODS K AND L INITIAL STUDY <br /> Person/ Timing or <br /> Monitoring Agency Frequency of <br /> Impact- Mitigation Measure Requirements Responsible" Monitoringz <br /> c)The wastewater treatment and storage ponds located within the 100-yearflDodplain shall Review pond design. SJCBD DP <br /> be set back from existing flood control levees to not interfere with inspection,maintenance, <br /> or repair of the flood control levees if applicable <br /> d)The wastewater treatment and storage pond levees shall be set back an appropriate Review pond design. SJCBD OP <br /> distance from existing flood control levees to ensure that them will be no loss of integrity of <br /> the flood control levees. <br /> M4.4.2.5 a)No sewage treatment facilities for Mountain House,Including storage ponds,and no Review of pan. SJCCDD SP <br /> The direct application of reclaimed water for areas for disposal of sewage effluent or sewage sludge shall be located in the Delta <br /> Irrigating crops in the Primary Zone of the Delta Primary Zone,as defined by Public Resources Code 29728. <br /> (Fabian Tract)could have a detrimental or <br /> limiting effect on the variety of crops that can be <br /> produced.The construction of storage ponds for <br /> reclaimed water could have a detrimental effect <br /> on delta islands with their peat soils and high <br /> ground water levels <br /> STORM DRAINAGE <br /> M4.4.3.1 a)Any proposed plans for construction or grading which include a detention basin shall Review Operations SJCBD DP <br /> The accumulation of floating debris and include a proposed schedule and description of necessary routine maintenance activities and Maintenance <br /> petroleum residual In detention ponds could for such detention basin(s)(including access roads). The maintenance plans may be in the Manual. <br /> create a nuisance condition(e.g.,odors, form of a general operations and maintenance manual or may be specific to the detention <br /> mosquito Infestation,and excessive algae basin(s)for which constructionlgrading plans are being submitted. <br /> growth)and cause adverse aesthetic effects <br /> GAS AND ELECTRICITY <br /> 4.4.4.1 a)Construction plans shall be submitted to PG&E and other easement owners for review Documentation from SJCCDD C in applicable <br /> The Master Plan does not provide specifications priorto construction in applicable specific plan areas,In particular,the construction plans PG&E areas <br /> for moving existing utilities and establishing should identify proposed land uses in utility easements,and procedures for movement of <br /> easements. heavy machinery over pipelines installed in non-roadway areas which may not be designed <br /> to withstand forces exerted by heavy loads <br /> (1112211 AlA �. <br />