Laserfiche WebLink
MOUNT4,,USE NEIGHBORHOODS K AND L INRIAL STUDY AFFE N oix A <br /> Person/ Timing or <br /> Monitoring Agency Frequency of <br /> Impact, Mitigation Measure Requirements Responsible° Monitoring' <br /> h) An estimate shall be made of the wastewater volume that may seep from the Documentation from CVRWQCB,SJCDPW DP for wastewater <br /> wastewater storage ponds,and an assessment of potential flow paths from pond seepage CVRWQCB. treatment plant <br /> shall be determined for the interim and potential permanent reclamation sites. The result of <br /> the assessment shall be submitted to the CVRWQCB for determination of whether <br /> agricultural drain discharge from land irrigated with reclaimed water would be regulated as a <br /> point-source discharge under the NPDES program. The determination by the CVRWQCB <br /> shall be provided in the reclamation plan. If it appears likely that the CVRWQCB would <br /> regulate the agricultural drain discharge,then assurance that the discharge would be <br /> allowed must be documented prior to approval of the reclamation plan <br /> M4.4.2.3 a)Beneficial reuse of sewage sludge shall be implemented to the maximum extent possible Review of plan. SJCDPW,MHCSD SP <br /> An inadequate wastewater sludge treatment and to minimize sludge disposal at a landfill or at a dedicated site <br /> disposal system could adversely impact water b) Interim Disposal. If the sludge meets acceptance criteria of a specific landfill,the sludge Review SJCDPW SP <br /> resources and public health. Scarce municipal shall be initially disposed of at an appropriately permitted landfill. Sludge shall meet documentation of <br /> landfill space may be occupied by sludge if nonhazardous classification and shall be dried to a minimum of 50 percent solids priorto sludge disposal. <br /> alternative disposaVreuse options were not disposal at a landfill. The duration of landfill disposal shall not exceed two years from the <br /> aggressively pursued, startup of the activated sludge treatment process,unless the sludge disposal program <br /> described in Implementation e)concludes that landfill disposal of wastewater sludge is the <br /> only viable option. - <br /> c)If landfill disposal of the wastewater sludge were proposed,an agreement or"will serve' Review SJCCDD,SJCDPW SP <br /> letter with a landfill that would accept the sludge for at least the next five years shall be documentation from <br /> provided with the Initial Wastewater Sludge Disposal Plan or subsequent specific plan. If disposal site. <br /> land spreading ordedicated land disposal were proposed,then guarantees of adequate <br /> acres for sludge disposal for at least the next five years must be provided. Provisions for <br /> sludge disposal shall be updated annually so that there are always firm provisions for <br /> disposal for at least five years into the future. <br /> M4.4.2.4 a)The wastewater treatment and storage pond levees shall be capable of withstanding a Review pond design. MHCSD DP <br /> Failure of the levees around wastewater maximum credible earthquake;ponds located within the 100-year Floodplain shall prevent <br /> treatment and storage ponds could cause inundation due to levee failure along Old River or other nearby waterways,be capable of <br /> flooding in the surrounding areas. withstanding the effects of flooding,and shall not impair the structural integrity of existing <br /> flood control levees. <br /> b)The detailed design of the wastewater treatment and storage pond levees shall be Review pond design. SJCBD DP <br /> included in the Reclamation Plan and initial Development Permit for the Wastewater <br /> Treatment Plant,and in all subsequent reclamation plans where additional ponds are <br /> proposed. The pond levees within the 100-year flood plain shall meet,as a minimum,the <br /> requirements of Section 65.10 Mapping of Areas Protected By Levee Systems,44 CFR Ch. <br /> I and the design standards specified herein. <br /> (11122111) A-5 <br />