Laserfiche WebLink
APPENDIX A MOUNTAIN HOUSE NEIGHBORHOODS K AND L INITIAL STUDY <br /> Person) Timing or <br /> Monitoring Agency Frequency of <br /> Impact. - Mitigation Measure Requirements Responsible° Monitoring° <br /> Biological Resources The County should participate in the preparation and implementation of a Countywide County is currently SJ County Council of Adoption of a Multi- <br /> Habitat Conservation plan for Swainson's hawk,San Joaquin kit fox and other species of participating in the Governments, Species HCP <br /> concern.Federal and/or State incidental take permits for endangered or threatened taxa preparation of a SJCCDD <br /> should be obtained for the MH and other projects.as required by the wildlife agencies. Countywide Multi- <br /> Copies of the take permits should be submitted to the County prior to issuance of any Species HCP.A <br /> construction or site improvements to ensure that any off-site replacement habitat is separate Swainson's <br /> provided before destruction of existing habitat.Stringent zoning controls should be imposed hawk HMP is included <br /> in areas of biological significance as identified by federal and state wildlife agencies. in the Master Plan in <br /> the event a Mulfi- <br /> Species HCP is not <br /> adopted. <br /> Air Quality Similar mitigation measures prepared for the project(i.e..land use mixes to promote non- Compliance with the SJCCDD,SJVUAPCD C,0 <br /> vehicular travel)should be implemented for all cumulative growth.The County should requirements of the <br /> develop a fee system for all new development,with funds to be used to mitigate air quality SJVUAPCD is <br /> impacts. included in the MP. <br /> Noise The County should use noise policies contained in the Noise Element of the General Plan Mitigation is Included SJCCDD SPS,C <br /> to evaluate potential noise impacts associated with proposed projects.Projects to be In the Master Plan. <br /> located in areas showing large noise increases should require noise studies to quantity,the Future SPs will <br /> project contribution to the future noise environment.If the noise impacts associated with a provide site specific <br /> specific project are found to be significant,mitigation measures should be proposed to noise studies/ <br /> reduce the impact.New,more restrictive noise and land use compatibility criteria for all mitigation. <br /> proposed land uses should be adopted by the County to match criteria of the Stale of <br /> California. <br /> a Impact Impact description is taken from the Final EIR(Sept 1994). <br /> b Monitoring Agencies Timing of Monitoring <br /> CDFG =California Department of Fish and Game C =At construction stage(prior to building permit issuance) <br /> COE =U.S.Army Corps of Engineers DP =Prior to submittal of first Development Penni) <br /> CVRWQCB=Central Valley Regional Water Quality Control Board 0 =Ongoing monitoring <br /> MHCSD =Mountain House Community Services District SP =Prior to specific plan approval;this maybe one or more specific plans <br /> SJCBD =San Joaquin County Building Division SPP =Priorto approval of Special Purpose Plan <br /> SJCC =San Joaquin County Counsel TDM =Pdor to approval of Transit Demand Management Plan <br /> SJCCDD =San Joaquin County Community Development Department PSR =Prior to approval of Project Study Reports <br /> SJCDPW =San Joaquin County Department of Public Works <br /> SJCEHO =San Joaquin County Environmental Health Department <br /> SJCMAD =San Joaquin County Mosquito Abatement District <br /> SJCSO =San Joaquin County Sheriffs Department <br /> TRFPD =Tracy Rural Fire Protection District <br /> USFWS =United States Fish and Wildlife Service <br /> SJVUAPCD=San Joaquin Valley Unified Air Pollution Control District <br /> a Mitigation Reference The letter and number reference as used in the Final ER. Adopted 11-10-94(amended 10-97,5-98)mountain\mllmonlm-monitr <br /> (rvzvn A f <br />