My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004969 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HEWITT
>
600
>
2600 - Land Use Program
>
PA-0500184
>
SU0004969 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:21 AM
Creation date
9/5/2019 11:16:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004969
PE
2622
FACILITY_NAME
PA-0500184
STREET_NUMBER
600
Direction
S
STREET_NAME
HEWITT
STREET_TYPE
RD
City
LINDEN
APN
18702003
ENTERED_DATE
4/6/2005 12:00:00 AM
SITE_LOCATION
600 S HEWITT RD
RECEIVED_DATE
4/5/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HEWITT\600\PA-0500184\SU0004969\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 SOIL PROFILE INFORMATION SECTION: <br /> 5.1 Site map showing location, with dimensions, of the soil profile pit on the parcel: See <br /> Appendix. <br /> 5.2 Description of soil profile pit including depth and dimensions: The shallow test holes <br /> were prepared per County Standards. The holes were excavated to a depth of approximately <br /> 36 inches and 8 inches in diameter. They were backfilled with 1-2 inches of"pea gravel." <br /> The deep holes were prepared per County Standards. The deep holes were drilled to a depth of <br /> approximately 22-24 feet. A 2 inch diameter PVC pipe with perforations on the bottom was <br /> used to measure the drop of water in the percolation test boring. Approximately 1-2 inches of <br /> "pea gravel" were placed in the bottom of test boring; the PVC was installed on top of the gravel. <br /> about 6 inches of"Pea gravel' was placed in the annular space around the pipe. <br /> 5.3 Description of soil lithology as noted from test pit by appropriate professional using <br /> industry standard protocol: The soil in this area is classified as Redding loam and San Joaquin <br /> sandy loam stated in the Soil Survey of San Joaquin County, California as provided by the <br /> United States Department of Agriculture, Soil Conservation Service. <br /> 5.4 Discussion of soil lithology as related to future onsite septic uses: The San Joaquin sandy <br /> loam and Redding gravel loam have very low permeability thus percolation rates were slow as <br /> demonstrated by the failure of both shallow and deep test on Parcels 1, 2, and 4. (See <br /> Appendix). <br /> 6.0 PERCOLATION TEST INFORMATION SECTION <br /> 6.1 Site Map Showing the location, with concise and accurate dimensions of the percolation <br /> test holes on the parcel: See Appendix. <br /> 6.2 The Minimum Number of Shallow and Deep Percolation Tests was Performed for Each <br /> Parcel: Four shallow percolation test holes were prepared, one on each proposed parcel. Four <br /> deep holes were also prepared due to the characteristics of the soil and the low permeability <br /> rates. <br /> 6.3 Description of the Date, Time and Protocol Used to Prepare the Test Hole, Including <br /> Depth and Dimensions of Hole, Preparation of Hole, and Depth of Water Used to Presoak <br /> (Minimum 12 Inches): The shallow test holes were excavated to a depth of 36 inches and <br /> 8 inches in diameter and backfilled with 1-2 inches of"pea gravel' in accordance with County <br /> Standards. The shallow holes were prepared by staff of Neil O. Anderson &Associates on <br /> December 20, 2005 and the 24 hour presoak period was started. The holes were filled with 12 <br /> inches of water over the gravel and at this time. Environmental Health Department was notified <br /> of the start of the test. <br /> The deep holes were excavated to a depth of approximately 22-24 feet, resprectively, and <br /> backfilled with 1-2 inches of"pea gravel'in accordance with County Standards. <br /> 3 <br /> c:W563\Soil Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.