My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004390
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWARD
>
7647
>
2600 - Land Use Program
>
SA-01-85
>
SU0004390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:45 AM
Creation date
9/5/2019 11:19:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004390
PE
2632
FACILITY_NAME
SA-01-85
STREET_NUMBER
7647
Direction
W
STREET_NAME
HOWARD
STREET_TYPE
RD
City
STOCKTON
APN
18922011
ENTERED_DATE
5/19/2004 12:00:00 AM
SITE_LOCATION
7647 W HOWARD RD
RECEIVED_DATE
11/21/2001 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOWARD\7647\SA-01-85\SU0004390\APPL.PDF \MIGRATIONS\H\HOWARD\7647\SA-01-85\SU0004390\CDD OK.PDF \MIGRATIONS\H\HOWARD\7647\SA-01-85\SU0004390\EH COND.PDF \MIGRATIONS\H\HOWARD\7647\SA-01-85\SU0004390\EH PERM .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-85 <br /> 3, The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $159.47 per <br /> additional daily trip-end generated in the Delta area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. The dry storage building shall have the lowest floor elevated or be dry flood-proofed a <br /> minimum of one foot above the 100-year flood elevation of 12 feet NGVD. Additionally, <br /> the applicant shall construct the pigeon lofts to simulate a pole barn. <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:ap <br />
The URL can be used to link to this page
Your browser does not support the video tag.