Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-85 <br /> 3, The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $159.47 per <br /> additional daily trip-end generated in the Delta area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. The dry storage building shall have the lowest floor elevated or be dry flood-proofed a <br /> minimum of one foot above the 100-year flood elevation of 12 feet NGVD. Additionally, <br /> the applicant shall construct the pigeon lofts to simulate a pole barn. <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:ap <br />