Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0900048 <br /> Church of God <br /> Site Approval Application No. PA-0900048 was approved by the San Joaquin County Planning <br /> Commission on September 17, 2009. The effective date of approval is September 27, 2009. This <br /> approval will expire on March 29, 2011, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, 209-468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVEDUSE: This approval is for a religious assembly facility for a maximum seating capacity <br /> of 50 people:;The project includes the construction of a 2,100 square foot religious facility as shown <br /> on the revised site plan dated July 17, 2009 (Use Type: Religious Assembly-Neighborhood). There <br /> is an existingresidence and storage building that is not a part of the project. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee ,is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. STORM DRAINAGE: Any additional storm water drainage created by new improvements shall be <br /> retained on-site. The drainage pattern and corresponding storm drain improvements shall be shown <br /> on the Site Plan. Drainage calculations prepared by a registered civil engineer or architect shall be <br /> included. (Development Title Section 9-1135) <br /> e. DEMOLITION PERMIT: Prior to the improvement of the parking area, a demolition permit shall be <br /> issued and finaled for the existing residence. Additionally, prior to the construction of the religious <br /> facility, a demolition permit shall be issued and finaled for the existing shed. <br /> I. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9- <br /> 1015.5[e)) <br /> Conditions of Approvpl 1 - PA-0900048 <br />