My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
3500 - Local Oversight Program
>
PR0544809
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 12:32:27 PM
Creation date
9/5/2019 11:32:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544809
PE
3526
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A S S O C I A T E S I N C <br /> Sample Analysis <br /> Selected samples will be immediately placed on ice and delivered under chain-of-custody <br /> documentation to a State-certified laboratory for analysis. At least two soil samples and possibly <br /> one groundwater sample will be analyzed for total petroleum hydrocarbons as gasoline (TPHg) <br /> using EPA Method 8015 Modified; benzene, toluene, ethylbenzene, and xylenes (BTEX) using <br /> EPA Method 8020; oxygenate fuel additives using EPA Method 8260; and total lead. <br /> Report Preparation <br /> Upon completion of all field activities, a summary report will be prepared for submittal to <br /> PHS/EHD. ATC will prepare a report that will include a description of all field activities, <br /> laboratory analytical results, boring logs, and recommendations. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. A completed Site Safety Plan (SSP) is contained in Attachment <br /> 1 and a Quality Control/Quality Assurance Plan is contained in Attachment 2. All field work will <br /> be completed in accordance with these plans. <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities. It is <br /> anticipated the drilling will be completed in one-half day. ATC will notify PHS/EHD at least 48 <br /> hours prior to beginning any field activities. The summary report will be submitted to PHS/EHD <br /> approximately four to five weeks after the completion of field activities. <br /> w:\14565\reports\wkn.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.