My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18633
>
2900 - Site Mitigation Program
>
PR0016245
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 2:05:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0016245
PE
2951
FACILITY_ID
FA0004588
FACILITY_NAME
CLEMENTS AUTO SERVICE
STREET_NUMBER
18633
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227
APN
01924030
CURRENT_STATUS
02
SITE_LOCATION
18633 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E' 1 <br /> ON <br /> ASSOCIATES <br /> GEOLOGIC <br /> May 28, 1993 <br /> 312-001.HSP <br /> HEALTH AND SAFETY PLAN <br /> FOR <br /> SUBSURFACE INVESTIGATION <br /> AT <br /> 18633 EAST HIGHWAY 88 <br /> CLEMENTS, CALIFORNIA <br />` INTRODUCTION <br /> This Health and Safety Plan (HSP) delineates the basic safety requirements <br /> for a Subsurface Investigation at the property located at 18633 East Highway 88 in <br /> Clements, California. The investigation will include drilling one soil boring. <br /> The provisions set forth in this HSP will apply to the employees of Roger <br /> Foott Associates, Inc., and its subcontractors working on this project. The <br /> subcontractors may elect to modify these provisions, but only to upgrade or increase <br /> the safety requirements, and only with the concurrence of Roger Foott Associates, <br /> Inc., as designated and accepted in writing. <br /> This HSP addresses the expected potential hazards that may be encountered <br /> for this project. Field activities are planned to begin on June 3, 1993,with the <br /> duration estimated at approximately 1 day. If changes in site or working conditions <br /> occur as the activities progress, addenda to this HSP will be provided by Roger Foott <br /> Associates, Inc. <br /> AUTHORITY FOR SITE SAFETY <br /> Roger Foott Associates, Inc., personnel responsible for the project safety are <br /> the Project Manager and the field geologist. The Health and Safety Coordinator is <br /> responsible for the overall Health and Safety Program of Roger Foott Associates, <br /> 1450 Harbor Boulevard, Suite G• West Sacramento,CA 95691 • (916) 325-2580 • Fax (916) 325-2570 <br /> 312-001.HSP '1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.