My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18633
>
2900 - Site Mitigation Program
>
PR0016245
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 2:05:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0016245
PE
2951
FACILITY_ID
FA0004588
FACILITY_NAME
CLEMENTS AUTO SERVICE
STREET_NUMBER
18633
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227
APN
01924030
CURRENT_STATUS
02
SITE_LOCATION
18633 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> Inc. and may choose to audit any site for compliance and take appropriate action to <br /> correct deficiencies. The Project Manager is responsible for implementing the <br /> provisions of this HSP, providing a copy of this HSP to the field personnel, and <br /> advising personnel used on health and safety matters. The Project Manager and field <br /> geologist have the authority to audit site activities for compliance with the provisions <br /> of this HSP and may suspend or modify work practices or dismiss:subcontractors <br /> whose conduct does not meet the requirements specified in this HSP. <br /> The Project Manager and field geologist are responsible for the dissemination <br /> of the information contained in this HSP to Roger Foott Associates, Inc., personnel <br /> assigned to the project and to the responsible representative of each subcontractor <br /> firm working under Roger Foott Associates, Inc., on the project. The field geologist <br /> will act as the Site Safety Officer: As such, the field geologist is responsible for <br /> adequately addressing the following items: <br /> • Safety supplies and equipment inventory onsite <br /> • Training programs and hazard communication <br /> • Procedures for reporting accidents or incidents <br /> • Decontamination and contamination-reduction procedures <br /> The field geologist has the authority to suspend work any time he or she finds <br /> that the provisions of the HSP are inadequate for worker safety. The field geologist <br /> will promptly inform the Project Manager and the Health and Safety coordinator of <br /> any deficiency within the HSP or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this HSP. <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Roger Foott Associates, Inc., and its subcontractors will <br /> attend a project-specific training meeting for safety issues and review the project <br /> tasks before beginning work. The meeting will be led by the field geologist. . <br /> HAZARDOUS MATERIALS PRESENT <br /> Previous work at the site has shown that a portion of the site's subsurface soil <br /> has been contaminated with hydrocarbons, specifically leaded gasoline. <br /> ROGER <br /> 312-00LHSP -2. KOT T <br /> ASSOCJA7FS <br />
The URL can be used to link to this page
Your browser does not support the video tag.