Laserfiche WebLink
4. BUILDING INSPECTION DIVISION: <br /> a. The following Uniform Building Code and San Joaquin County Ordinance requirement will <br /> be applicable and shall be incorporated in the construction plans before submittal to the <br /> Building Inspection Division: <br /> (1) Provide restrooms conforming with all disabled access requirements. (CCR,Title <br /> 24) <br /> b. A grading plan shall be submitted by the applicant, and it shall be approved and a <br /> grading permit issued by the Building Inspection Division prior to any excavation or filling <br /> of earth material: <br /> (1) The grading plan shall contain the information listed in the UBC, Appendix, <br /> Chapter 70, Section 7006(1). <br /> (2) The grading plan shall inckide complete drainage details and elevations of the <br /> adjacent parcels Retaining wall details shall be submitted where applicable. <br /> (3) Grading in excess of 5,000 cubic yards shall comply with Section 7014 for <br /> 'Engineered Grading Requirements.' <br /> (4) All recommendations of the soils engineer shall be incorporated in the grading <br /> plan. <br /> (5) All compaction reports must be submitted prior to a foundation inspection. <br /> (6) All grading permits are subject to approval by the other departments. <br /> (7) All grading authorized by the permit shall be approved prior to issuance of any <br /> building permits or the beginning of any construction. <br /> C. The Construction Site Plan shall indicate the following: <br /> (1) Provide parking for the physically disabled. The spaces shall be located as close <br /> as possible to the primary entrance. (CCR, Title 24) <br /> (2) Provide identification signs for the parking spaces, including the 'tow away' sign, <br /> to be located at each entrance or visible from each space. <br /> (3) The slope of a parking space shag not exceed '/41ch per foot (CCR, Title 24) <br /> d. An existing elevation certification is required with all permit applications for structures <br /> located within the 100-year flood zone. <br /> Conditions of Approval - 3 - UP-93-3 <br />