My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002310
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
20065
>
2600 - Land Use Program
>
UP-93-03
>
SU0002310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:10 AM
Creation date
9/6/2019 9:54:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002310
PE
2626
FACILITY_NAME
UP-93-03
STREET_NUMBER
20065
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
20065 S MACARTHUR DR
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\20065\UP-93-03\SU0002310\APPL.PDF \MIGRATIONS\M\MACARTHUR\20065\UP-93-03\SU0002310\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\20065\UP-93-03\SU0002310\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frontage and Roadway Improvement Agreement or a Secured Deferred Frontage and <br /> Roadway Improvement Agreement with a deposit equivalent to the estimated construction <br /> costs prior to approval of the Improvement Plan. A$260.00 fee currently is required for <br /> processing, per Development Title Table 9-240.2, in addition to a copy of the Grant Deed <br /> and an estimate for the required frontage improvements. The estimate shall be prepared <br /> by a Registered Civil Engineer with a typical section drawing on a form to be supplied by <br /> the Department of Public Works and submitted to Public Works for approval. As an <br /> option, Public Works will prepare the drawing and estimate for an additional fee of <br /> $115.00. (Development Title Section 9-11502) <br /> b. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standard R-17 prior to issuance of the occupancy permit. (Development <br /> Title Section 9-1145.5) <br /> C. An encroachment permit shall be required for work within the road right-of-way. <br /> (Development Title Section 9-11452) <br /> d. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee currently is $236.33 per <br /> daily trip-end generated in the Tracy area The fee shall be automatically adjusted July <br /> 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolutions R-90304 & R-91-1025) <br /> 3. PUBLIC HEALTH SERVICES: <br /> a The soil suitability study required by MS-92-103.must be done prior to septic system <br /> construction if both MS-92-103 and UP-93-3 are to be completed. A review fee of$156.00 <br /> is required at the time of submittal to the Environmental Health Division. <br /> b. A sewage disposal area as indicated by the septic tank suitability study and/or <br /> percolation tests must be shown for each parcel on the final subdivision improvement <br /> plans. <br /> C. State on revised plans or improvement plans the maximum number of employees and <br /> patrons the sewage disposal system is being designed for and that the leach field area <br /> will be barricaded so that it cannot be driven over, parked on, or used as a storage area <br /> This leach field area must be used for that Specific purpose only and cannot contain any <br /> underground utility lines. <br /> d. Construct an individual sewage disposal system under a permit and inspection by the <br /> Environmental Health Division at the time of development. (Ordinance Code Section 5- <br /> 3003) <br /> e. Construct a water well under permit and inspection by the Environmental Health Division <br /> prior to occupancy. Should the number of nonresident individuals exceed 24 for at least <br /> 60 days per year, or the number of service connections exceed four, a yearly permit to <br /> operate a public water system under the provisions of Title 22, CCR, will be required by <br /> the Environmental Health Division and San Joaquin County Ordinance 1862, Section 5- <br /> 4100. <br /> Conditions of Approval -2 - UP-933 <br />
The URL can be used to link to this page
Your browser does not support the video tag.