Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-03-303 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $195.51 per additional <br /> daily trip-end generated in the Tracy area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 6. An on-site retention pond shall be provided to meet the requirements of the County. The drainage <br /> facilities shall be designed and constructed in accordance with San Joaquin County Improvement <br /> Standards. <br /> (Development Title Section 9-1135.2) <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall <br /> require a State NPDES construction permit. <br /> DTP:SH:ar <br /> P\;OF MNTS\kA 2W3TA43W303.wpd <br />