My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011111
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29293
>
2600 - Land Use Program
>
QX-84-0010
>
SU0011111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 5:07:04 PM
Creation date
9/6/2019 9:55:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011111
PE
2656
FACILITY_NAME
QX-84-0010
STREET_NUMBER
29293
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
25312012
ENTERED_DATE
11/1/2016 12:00:00 AM
SITE_LOCATION
29293 S MACARTHUR RD
RECEIVED_DATE
10/31/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29293\QX-84-10\SU0011111\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revisions of Approved Actions Application <br /> Timeline Adjustment <br /> Tracy Rock/Traina West <br /> San Joaquin County EP/QX-84-10 <br /> CA Mine ID 91-39-0006 <br /> September 30, 2016 <br /> Land Owner <br /> Teichert Land Company <br /> P. 0. Box 13308 <br /> Sacramento, CA 95813-3308 <br /> Attention:Jason Smith <br /> (916) 484-3317 <br /> Applicant <br /> Teichert Aggregates <br /> P.O. Box 15002 <br /> Sacramento, CA 95851 <br /> Attention: Jason Smith <br /> Location <br /> The West Side of MacArthur Dr., 2000 feet south of Linne Rd. The Site is the Traina West mining <br /> property. <br /> APN Zoning Acres <br /> 253-120-014 AG-40 OS/RC 30.39 <br /> 253-120-027 AG-40 OS/RC 28.03 <br /> Project Description <br /> Timeline Revision to EP/QX-84-10, Condition of Approval 15 <br /> Existing Condition <br /> The rehabilitation of The rehabilitation of each phase shall be completed, in conformance with <br /> the rehabilitation plan, within two (2) years of the completion of the extraction portion of that <br /> phase. Rehabilitation shall be completed as soon as feasible. The schedule for rehabilitation will <br /> be a part of the approval of the excavation. It will define each phase of the excavation. The <br /> phases may be based on the sequence in which individual areas are to be excavated and <br /> rehabilitated, or on the sequence in which various operations are to be carried out in each area <br /> during each phase. The cost of rehabilitation shall be determined for each phase in order to <br /> determine the amount of performance guarantee. <br /> Rehabilitation of parcels 253-120-14 and 27. known as the Traina West parcel, may be deferred <br /> while the Traina West parcel is used for the storage and filtering of water from the Tracy Rock <br /> Plant (parcel 253-12012). Rehabilitation of the Traina West parcel shall be completed within <br />
The URL can be used to link to this page
Your browser does not support the video tag.