My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011111
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29293
>
2600 - Land Use Program
>
QX-84-0010
>
SU0011111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 5:07:04 PM
Creation date
9/6/2019 9:55:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011111
PE
2656
FACILITY_NAME
QX-84-0010
STREET_NUMBER
29293
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
25312012
ENTERED_DATE
11/1/2016 12:00:00 AM
SITE_LOCATION
29293 S MACARTHUR RD
RECEIVED_DATE
10/31/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\29293\QX-84-10\SU0011111\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
two years of the time the Traina West parcel is no longer used for the storage and filtration of <br /> water from the Plant and prior to 14 years from the approval of the Revisions of Approved <br /> Actions. <br /> 2. The reclamation plan is revised by this action to indicate the following reclamation dates: <br /> Mitchell-Sexton: On or before December 2002 <br /> Flintkote: On or before December 2006 <br /> Traina West: On or before December 2016 <br /> Proposed Condition <br /> Whereas Rehabilitation has been complete on the Mitchell-Sexton, and Flintkote Properties, <br /> rehabilitation of the Traina West Parcels (253-120-014, 253-120-027) shall be complete no later <br /> than December 311, 2019. Rehabilitation may be completed sooner as agreed upon by Teichert <br /> and San Joaquin County. <br /> Background <br /> Conditional use permit EP-84-10 entitles Teichert to mine three properties known as Flintkote, <br /> Mitchell-Sexton and Traina West, with aggregate material being processed at the adjacent <br /> Tracy Plant Site. Mining has been complete at all three properties, with reclamation sign off <br /> being completed for both Flintkote (2007) and Mitchell-Sexton (2004). The remaining Traina <br /> West properties reclamation work is nearly complete. The grading of the properties into a two <br /> terraced agricultural field has been complete, and revegetation is currently underway with <br /> completion scheduled by the end of October 2016. The final step in completing reclamation will <br /> be monitoring.The Financial Assurance Mechanism will remain in place until reclamation sign <br /> off is complete. <br /> Conclusion <br /> Teichert Aggregates respectfully requests that the Planning Commission approve the requested <br /> Revisions of Approved Action by updating the requested language to Condition 15 of EP-84-10. <br /> The proposed revision to the Conditions of Approval will not change the end use or alter any of <br /> the adopted environmental mitigation measures or other Conditions of Approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.