Comments for PA 0800005 (UP) <br /> I. The Project description indicates that is being submitted in the form of a Transfer Processing <br /> Report(TPR)format and includes a Report of Compost Site Information(RCSI) document. The <br /> two documents are being evaluated as a proposed project description only. The documents will <br /> require further review during the Solid Waste Facility Permit(SWFP) process. <br /> 2. The project description indicates on Page ES-7, that the facility will operate 24 hours per day. <br /> The document does not include an analysis for impacts from noise and lighting. Provide an <br /> analysis of the impacts regarding noise and lighting. <br /> 3. The project description proposes to increase hours of operation, vehicle traffic, tonnage and <br /> building size. The discussion regarding facility design is not adequate.The proposed increases in <br /> waste and traffic volumes are 2.5 and 3 times the existing approved volumes.The increase in <br /> floor space or building size is not quite 50 percent of the existing building. The EHD has <br /> concerns that the facility operating at full capacity would not be able to safely handle the waste. <br /> a. Vehicle traffic; the project description indicates that the facility is proposing to increase <br /> vehicle traffic from 560 vehicle trips to 1727 vehicle trips per day. The site is confined <br /> and the tipping area is small. <br /> 1. Provide calculations that show the number of vehicles that can safely unload at <br /> each of the tipping areas onsite. <br /> 2. Provide information showing traffic patterns. <br /> 3. Provide anticipated vehicle quelling time through the scales and tipping area. <br /> b. The proposed project description mentions that the additional hours of operation will <br /> allow the facility to handle additional vehicles. This is true to a point. Vehicles that arrive <br /> at the facility are not evenly spaced and tend to show up at approximately the same time. <br /> I. Indicate the area designated for vehicle quelling and explain how the area will <br /> accommodate the expected vehicle traffic. <br /> 2. Discuss the anticipated number of vehicles per hour <br /> c. Tonnage;the project description proposes to increase the per day tonnage by 2.5 times <br /> the current tonnage. The design calculation does not discuss the amount of equipment <br /> that would be on the tipping floor in order to facilitate the processing of the waste. The <br /> project description does not mention how much area would be required for vehicle <br /> unloading(type of vehicle,size, volume of waste contained), or the number of vehicles <br /> that would be unloading at one time. The proposed project does not indicated if there <br /> will be a separate unloading area for the self haul customers or the number of waste <br /> screeners/spotters on the tipping floor during the operation. <br /> 1. Provide a facility capacity study that analyzes the traffic and waste volume as it <br /> relates to the proposed changes and facility capacity. Include the calculations <br /> that will take in to account the space or area required to safely conduct the <br /> proposed operations. <br /> 4. The project description on page 22,indicates that the facility does not knowingly receive <br /> Household Hazardous Waste(HHW).The facility currently collects antifreeze, waste oil, <br /> batteries, and paint. Revise to accurately reflect current site conditions. <br />