My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006921
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
PA-0800005
>
SU0006921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:48 AM
Creation date
9/6/2019 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006921
PE
2627
FACILITY_NAME
PA-0800005
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313019 26
ENTERED_DATE
1/24/2008 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
RECEIVED_DATE
1/11/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\APPL.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH COND.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John L. Funderburg -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-0800005 (UP) <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> Ilie owner shallcxecuteanlrrcvocubiaC1 ;' ._n: nttoi ill 'U;ty- <br /> two(42)foot wide right-of-way from the centerline of MacArdtur Drive to Liie property across the <br /> frontage of APN 253-130-26. (A fee based on the current fee schedule is required for processing the <br /> agreement per Development Title Table 9-240.2 as well as a copy of the most current grant deed of <br /> the subject property) (Development Title Section 9-1150.5) <br /> 3. The entire route from the project site to Linne Road shall be kept clear of debris on a daily basis. <br /> 4. All of MacArthur Road(from U.P.R.R. crossing to the south project access driveway) shall be <br /> improved to a traffic index(TI)of 9.5 prior to establishment of the use. All improvements shall be <br /> in conformance with the current Improvement Standards and Specifications of the County of San <br /> Joaquin. These improvement plans and specifications are subject to plan check, field inspection fees <br /> and must be approved by the County of San Joaquin Department of Public Works.Fees for plan <br /> check and field inspection will be based on the current Public Works fee schedule. (Development <br /> Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> 5. The frontage improvements for MacArthur Road shall be constructed in conformance with the <br /> standards for one-half of an 84-foot wide right-of-way Rural Arterial Road. The construction of the <br /> frontage improvements will be deferred, upon execution by the owner of a Deferred Frontage and <br /> Roadway Improvement Agreement prior to release of building permit. (A fee based on the current <br /> fee schedule is required for processing the agreement per Development Title Table 9-240.2 in <br /> addition to the submittal of a copy of the subject property grant deed and an estimate of the proposed <br /> improvements. The estimate shall be prepared by a registered civil engineer with a typical section <br /> drawing on a form to be supplied by the Department of Public Works and submitted to the <br /> Department of Public Works for approval. As an option, the Department of Public Works will <br /> prepare the drawing with estimate for an additional fee)(Development Title Section 9-1150.2[d][4]) <br /> 6. The applicant shall enter in to an agreement to pay an annual road maintenance fee of$0.06 per <br /> equivalent ton of material entering the site. The fee is based upon the September 2011 ENR <br /> Construction Cost Index of 9,116, and will be adjusted annually. <br /> 7. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 8. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee is based on the current schedule. <br /> (Resolution R-06-38) <br /> 9. Drainage from the site shall be retained on-site by a retention basin and meet the requirements of <br /> San Joaquin County Development Standards. Retention ponds shall be fenced with six(6)foot high <br /> chain link fence or equal when the maximum design depth is 18 inches or more. Required retention <br />
The URL can be used to link to this page
Your browser does not support the video tag.