Laserfiche WebLink
30703 S. MacArthur Drive,"Tracy <br /> K. The Project Description proposes to increase traffic to 1727 vehicles per day. The project <br /> description did not reference or provide a traffic study to support the proposed numbers. <br /> L. The Biomass Gasification Unit proposes to use 40 TPD of processed clean wood waste to <br /> generate 1 mega-watt/hour of energy for on-site use. The EHD needs more information on <br /> � <br /> ' l :h cp.-r`c,i of cl :an_.I .1f IJ i�N�i ailOn Of u _ 1710n'1_� � - ,,On Cf�.t ai .,n <br /> covor; .m 1"-I:? .. i:(sd C' <br /> utility "rom the San Joaquin Valley Air �-illrol �iairic: is reyclrcJ. <br /> M. Expand the outdoor green waste processing operations to allow the processing of co- <br /> collected residential green waste with food waste, to produce compost feedstock and/or <br /> anaerobic digestion feedstock. The EHD will need more information on additional <br /> reasonable measures to minimize odors, including feedstock characteristics and quality, and <br /> GIMP. <br /> N. The phased approach to this project does allow the facility to incrementally increase the <br /> capacity of the facility. The first phase of the project appears to be suitable for the size of the <br /> facility. The Environmental Health Department (EHD) has concerns regarding the second <br /> phase of the proposed project. Prior to implementing the second phase of the proposed <br /> project the proponent must conduct a operational analysis based on real time conditions at <br /> the site. Based on the review of the operational analysis the EHD may require additional <br /> equipment, quelling lanes and changes to onsite traffic patterns to insure safe operation of <br /> the facility, prior to the approval of Phase ll. The operational analysis must be approved 180 <br /> days by the EHD prior to making application for a revised Solid Waste Facility Permit. <br />