Laserfiche WebLink
SAN JOAQUIN COUNTY PLANNING COMMISSION AGENDA <br /> Public Heafth/Planning Auditorium <br /> San Joaquin County Department of Public Health Services <br /> 1601 East Hazelton Avenue, Stockton, Califomia <br /> THURSDAY,February 2,2012 Environmental Health Dept, <br /> 6:30 P.M. Attn: Rodney Estrada <br /> • Flag Salute 600 E. Main Street <br /> Stockton, CA 95202 <br /> • Roll Call I'm -e <br /> • Minutes From Meetings of December 1, 2011,January 5, 2012 and January 19, 2012 <br /> • Action on Requests for Continuances or Withdrawals <br /> • Explanation of Hearing Procedures <br /> • Action Items <br /> • Consent Agenda(Item 1 and 2): Items calendared for consent will be approved <br /> in one motion without a public hearing unless a member of the Planning <br /> Commission or the audience requests that the item be removed from the consent <br /> calendar and heard separately. <br /> CSENT 1. USE PERMIT APPLICATION NO. PA4100012 OF P&D LODUCA LLC <br /> AppII / PL for truck parking for up to sixty trucks and sixty trailers on a 5- <br /> App S acre parcel in the AL-5 zone for the hauling of agricultural products <br /> pursuant to Development Title Section 9-605.6(w). The property is zoned <br /> AL-5 and the General Plan designation is AIL. The property is not under <br /> Williamson Act Contract. The project site is located on the west side of <br /> State Route 99 W. Frontage Road, 2,000 feet north of Eight Mile Road, <br /> south of Lodi (Supervisorial District 4). (This item was continued from <br /> the Planning Commission meetings of September 15,2011, <br /> October 20, 2011 and January 5, 2012) (i 2PJ� thov Iq <br /> Environmental Determination: An Initial Study has been/prepared <br /> indicating the project will not have a significant impact on the environment, <br /> and a Negative Declaration has been prepared for the project. <br /> CO SENT 2. USE PERMIT APPLICATION NO. PA-0800005 OF TRACY MATERIR,L <br /> ,_WG�fli RECOVERY INC.for the expansion of an existing solid waste processing <br /> S and recycling facility from 39.2 acres to 51.7 acres in two phases over <br /> twenty years with a maximum of 1,727 vehicles per day at final build out. <br /> Phase 1 to increase the daily waste capacity from 1,000 tons per, day <br /> (TPD)to 1,800 TPD within ten years. Phase 1 site improvements will <br /> include the addition of 19,200 square feet to the existing 57,200 square <br /> foot material recovery facility and transfer station buildisig; the addition of <br /> 10,500 square feet to the existing maintenance and administration <br /> building; construction of a one mega-watt wood wast:a bio-mass <br /> gasification unit;construction of a 5,000 square foot covered storage <br /> area and loading dock; Phase 2 to increase the dairy waste capacity from <br /> 1,800 TPD to 2,500 TPD within twenty years. The, project will employ <br /> 160 persons and operate 24 hours a day, 7 days a week. All outdoor <br /> PC AGENDA 1 - PC: 2-2-12 <br />