Laserfiche WebLink
�X/ <br /> SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT \ / <br /> l< a <br /> 1810 E.NAZELTON AVE.,STOCKTON,CA 95205-6232 <br /> PHONE:209/468-3121 FAX:209/468-3163 <br /> AGENDA <br /> San Joaquin County Development Committee <br /> 1810 E.Hazelton Avenue,Stockton, California 95205-6232 <br /> Wednesday,October 26,2011 <br /> 9:30 a.m. 1. USE PERMIT APPLICATION NO.PA-1100168 OF KOSTAS FOTI& <br /> MH DIMITRA KAPINIARIS(C/O DELTA BUILDINGS INC.) A Use Permit <br /> application for a large winery to be built in four phases over fifteen years with 30 <br /> F. marketing events and 4 special events per year for a maximum of 150 people per <br /> event. Phase one to contain the construction of a 6,000 square foot wine case <br /> production building and 4,800 square foot wine tasting building with restrooms, <br /> covered patio, storage area and kitchen.Kitchen will be only used for marketing <br /> events. Phase two to contain the construction of a 6,000 square foot office,lab, <br /> kitchen,and caretaker facility and a 7,000 square foot production and barrel storage <br /> room. Phase three to contain the construction of a 10,000 square foot production <br /> building. Phase four to contain the construction of a 8,750 square foot wine tank <br /> storage building. This parcel is under a Williamson Act contract. Located on the <br /> west side of N. Davis Road, 1,500 feet south of Turner Road,west of Lodi(APN: <br /> 025-160-12; Address: 17521 N. Davis Road,Lodi). <br /> 10:00 a.m. 2. USE PERMIT APPLICATION NO.PA-0800005 OF TRACY MATERIALS <br /> JF RECOVERY. A Use Permit application for the expansion of an existing solid waste <br /> / processing and recycling facility from 39.2 acres to 51.7 acres in two phases over <br /> twenty years with a maximum of 1,727 vehicles per day at final build out. Phase 1 to <br /> increase the daily waste capacity from 1,000(tpd)to 1,800(tpd)within ten years and <br /> '914 Phase 2 to increase the daily waste capacity from 1,800(tpd)to 2,500(tpd)within <br /> twenty years. The project will employ 160 persons and operate 24 hours a day seven <br /> (7)days a week. All outdoor processing activities will not begin before 6:00 a.m.and <br /> J will not operate after 10:00 p.m.on site activities to include vehicle maintenance, <br /> equipment storage and truck parking,construction and demolition of inert debris <br /> (cdi),processing wood waste grindings,appliance recycling, and associated waste <br /> Q p- ;ll�C, j <� handling activates. Proposed site improvements will include: (1)the addition of <br /> 19,200 square feet to the existing 57,200 square foot material recovery facility and <br /> transfer station building.(2)addition of 10,500 square feet to the existing <br /> maintenance and administration building. (3)construction of a one(1)maga-watt <br /> wood waste bio-mass gasification unit for on-site energy use only,the project site is <br /> not under a Williamson Act contract. Located on the west side of S.Mac Arthur <br /> Drive(APN: 253-130-19, 26;Address:30703 S.Mac Arthur Drive,Tracy). <br />