Laserfiche WebLink
Project Description <br /> Tracy Material Recovery Facility and Transfer Station <br /> 30703 S. MacArthur Drive, Tracy, Caftmla 95377 <br /> Proposed Project <br /> The proposed project would increase the capacity of the MRF/TS from the <br /> current permitted capacity of 1,000 TPD to 2,500 TPD to accommodate the <br /> growth of the City of Tracy and the County of San Joaquin, and to address the <br /> City of Tracy's Enhanced Diversion Plan. The MRFITS will be poised to <br /> accommodate a series of new CIWMB policies on their goal to zero waste. The <br /> operations area will be expanded by 12.5 acres to the south. <br /> Tracy MRF/TS <br /> Existing and Proposed Tonnages <br /> EXISTING TONS IN CURRENT ENTITLEMENTS <br /> INSIDE OUTSIDE <br /> YEAR TRANS. MATERIAL COMPOSTING WOOD INERTS MIXED TOTAL <br /> STATION RECOVERY WASTE C&D <br /> FACILITY <br /> 2006 500 TPD 200 TPD 135 TPD ave 100 TPD 50 TPD 50 TPD 1000 TPD <br /> 20-YEAR BUSINESS PLAN WITH 20 YEARS OF GROWTH <br /> FROM 1000 TPD IN 2008 TO 2500 TPD IN 2028 <br /> PROPOSED TONNAGES FOR FUTURE ENTITLEMENTS <br /> 2028 1000 TPD 480 TPD 200 TPD 220 TPD 200 TPD 400 TPD 2500 TPD <br /> peak <br /> 20 TPD x 25 TPD x <br /> 24 hours 16 hours <br /> 132 TPD ave <br /> Material Recovery Facility/Transfer Station <br /> The existing 47,200 square foot MRF/TS was recently expanded in 2008 by <br /> 10,200 square feet of floor space and houses a paper baler, and is approximately <br /> 37 feet tall. The capacity of the Transfer Station will be up to 1000 TPD. <br /> An additional expansion of the tipping floor is proposed by building a 19,200 <br /> square foot expansion to the north side of the existing structure. <br /> The MRF Equipment within the Building has recently been upgraded with more <br /> efficient and mechanical equipment to process up to 480 TPD with machinery <br /> capable of processing 20 tons per hours, up to 24 hours per day. The types of <br /> materials on the sort line wil include commercial commingled recyclables as well <br /> as residential commingled recyclables. <br /> The Project Description of the MRF/TS and ancillary facility is fully described in <br /> the attached document formatted as a Transfer/Processing Report. <br /> 170.18 CUP Project Des 050710 <br /> ES-9 <br />