Laserfiche WebLink
Project Description <br /> Tracy Material Recovery Facility and Transfer Statlon <br /> 307035 Mac9rthur Drive, Tracy, Callfomla 95377 <br /> Wood Waste Processing Area <br /> The Wood Waste Processing Area would be re-located to the expansion area to <br /> the south with an increase in capacity of 300 TPD. <br /> Biomass Gasification Unit <br /> Biomass Gasification Unit proposes to use 40 TPD of processed clean wood <br /> waste to generate 1 mega-watt/hour of energy for on-site use. J <br /> Infrastructure Development (as shown on the Site Plan): <br /> The following infrastructure is being proposed to support the Facility Expansion" <br /> • Addition of approximately 85 truck parking spaces <br /> • Addition of approximately 45 employee/visitor space parking area with <br /> landscaping <br /> • Addition of paved bin and equipment storage area <br /> • Addition of paved roadway access on southern parcel <br /> • Addition of 10,500 square feet to existing Administrative <br /> Office/Maintenance Building <br /> Station Security <br /> Currently, the site is entirely enclosed with a 6-foot high solid chain link fence <br /> along the perimeter with locking gates on S. MacArthur Drive. The fence is <br /> slatted along portions of the frontage of S. MacArthur Drive to screen views of <br /> the interior of the site. <br /> Lighting is provided at the Inert Processing Area and C&D Operations Area. <br /> Tracy MRF & TS will utilize temporary or permanent lighting units for processing <br /> the materials before or after daylight hours. Mobile equipment and vehicles using <br /> G the site are equipped with lights for safe use at night or during times of limited <br /> visibility. <br /> Tracy MRF & TS may install additional 20-to-30-foot-high stadium lighting within <br /> the facility for security purposes that will enable them to process debris before <br /> and after daylight, within the operating hours of 6:00 a.m. and 10:00 p.m. Onsite <br /> processing buildings will contain interior lighting and may have exterior lighting <br /> affixed. The lighting will be facing downwards and inwards towards the facility <br /> and will not point outwards and subject neighboring properties to glare. <br /> Roads <br /> All site maneuvering and parking lots and Compost Facility are paved with <br /> asphalt-concrete or concrete. The C&D/Inert Processing Facility operations area, <br /> and adjacent roads in the expansion area, may be compacted gravel as <br /> described herein. <br /> Visual Screening <br /> The driveway and entrance areas to the facility are the only ground level areas <br /> visible to passersby. A daily (at minimum) site walk by facility personnel focuses <br /> 170.18 CUP Project Des 050710 <br /> ES-11 <br />