Laserfiche WebLink
Project Description <br /> Tracy Material Recovery Facility and Transfer Station Expansion <br /> 30,703 S. MacArthur Drive, Tracy, California 95377 <br /> ••r Table 8 - Project Traffic Summary <br /> Residential Commercial <br /> Employees Self-Haul Total Transfer Compost Total <br /> Visitors Collection Collection Trucks Trucks Vehicles Inbound Trucks Safes Outbound <br /> Total <br /> Vehicles 160 15 134 351 874 1534 102 91 193 <br /> Avg.per <br /> load 5.77 3.45 0.59 22.5 1.0 <br /> Total Tons 773 1,211 516 2,500 2,322 91 2,413 <br /> Hours of Operations: <br /> The hours of operations for each activity are listed in Table 9 below. <br /> Table 9 - Hours of Operations <br /> Operations Receipt of Material Handling of Material Maintenance ofMachinery <br /> Material Recovery 24 hours per day 24 hours per day 24 hours per day <br /> Facility and Transfer Monday thru Sunday Monday thru Sunday Monday thru Sunday <br /> Station <br /> Truck transfer of solid 24 hours per day 24 hours per day 24 hours per day <br /> wastes Monday thru Sunday Monday thru Sunday Monday thru Sunday <br /> Self-haul delivery of solid 6:00 a.m. to 6:00 p.m. 24 hours per day 24 hours per day <br /> wastes Monday thru Sunday Monday thru Sunday Monday thru Sunday <br /> Maintenance Building NIA NIA 24 hours per day <br /> Monday thru Sunday <br /> Compost Facility 24 hours per day 6:00 a.m. to 10:00 p.m. 24 hours per day <br /> Monday thru Sunday Monday thru Sunday Monday thru Sunday <br /> C&D Processing Facility 24 hours per day 6:00 a.m. to 10:00 p.m. 24 hours per day <br /> Monday thru Sunday Monday thru Sunday Monday thru Sunday <br /> Inert Debris Processing 24 hours per day 6:00 a.m. to 10:00 p.m. 24 hours per day <br /> Operation Monday thru Sunday Monday thru Sunday Monday thru Sunday <br /> Note:The Transfer Station and Material Recovery Facility will be closed on Christmas Day and New Year's Day. <br /> Site Improvements and Conditions <br /> The following site improvements and existing conditions are proposed as shown on the <br /> Site Plan in Appendix A. <br /> Transfer Station and Material Recovery Facility Building Expansion: <br /> The 47,200 square foot MRF/TS building is currently undergoing an approved <br /> expansion of an additional 10,200 square feet (Phase 1 addition) for covered storage of <br /> recyclable materials on the western side, for a total enclosed space of 57,400 square <br /> 17 <br /> 170.18.03 CUP Project Description 050710 <br />