Laserfiche WebLink
Project Description <br /> Tracy Material Recovery Facility and Transfer Station Expansion <br /> 30703 S. Mac*thur Drive, Tracy, Califomia 95377 <br /> a.► Table 11 <br /> Current Baseline and Proposed Operation for Biomass Wood Chips <br /> Current System—Baseline Proposed Biomass Gasification Unit <br /> Fuel Source Processed clean wood chips from permitted facilities that remove treated wood <br /> waste and other contaminants. <br /> Fuel Supply 40 tons per day of clean wood chips from on-site wood waste recovered from <br /> the mixed C&D Processing Facility and wood waste processing area. <br /> Technology Large biomass energy facilities from On-Site gasification technologies with <br /> the mid-1980 are in the California greater efficiencies from 30% to 75% <br /> Central Valley that utilizes an with cogeneration. <br /> upgraded steam-turbine cycle with <br /> 20%efficiency. <br /> Permits Local air district permit and land use Local air district permit and land use <br /> entitlements. entitlements. San Joaquin Valley <br /> APCD has issued Permit to Operate <br /> for a similar biomass gasification unit <br /> (copy in Appendix E) <br /> Haul 40 tons per day, or 2 trips, about 20 40 tons per day on-site. No hauling <br /> roundtrip miles to a large Central and reduced 2 transfer trailers of traffic <br /> Valley biomass energy facility. per day. <br /> ..r GHG emissions 0.36 metric tons per trip, or 151.2 None. Reduce GHG emission by 151.2 <br /> from hauling metric tons per year metric tons per year. <br /> GHG emission from 500 metric tons of anthropogenic Reduce GHG emission by 500 metric <br /> typical MRF CO2from utility. tons per year. Carbon Neutral due to <br /> operations biogenic fuel source. The switch to on- <br /> site biomass energy, with minimal <br /> transmission losses, with a distributed <br /> generation model. <br /> Residual Biomass ash from 7% to 10% of Bio-Char from 1% to 5% of feedstock <br /> feedstock that can be used for land that offers long-term soil sequestration <br /> application. of carbon. <br /> The applicant proposes to add a biomass gasification unit to produce green electricity <br /> out of the clean processed wood waste materials that are currently recovered and <br /> processed on-site. The applicant proposes to utilize 40 tons per day (TPD) of clean <br /> wood chips processed on-site to generate approximately 1 mega-watt/hour of electricity. <br /> The biomass gasification unit will only receive clean processed wood chips, and a <br /> similar unit has already obtained the necessary air permits from the San Joaquin Valley <br /> Air Pollution Control District. The wood waste that is recovered and processed into <br /> ..� biomass wood chips is currently being hauled to the Central Valley (to Woodland, Tracy, <br /> 25 <br /> 170.18.03 CUP Project Description 050710 <br />