Laserfiche WebLink
Project Description —Construction &Demo]ition/Inert Debris Facility Report <br /> I Tracy Materlal Recovery Facility and Transfer Station <br /> 30703 S. Mac,4rthur Drive, Tracy, California 95377 <br /> i Training [14 CCW17414 (g)] <br /> I <br /> � <br /> Training records will be maintained in accordance with [14 CCR 17410.3]. This <br /> information is kept <br /> Site Manager. rn <br /> file in the administrative office under the supervision of the <br /> DRS Regulations '[14 CCR 17414 (h)] <br /> i <br /> 3 Tracy MRF & TS will maintain records in accordance with the Disposal Reporting <br /> I Regulations [14 CCR 18809] for all material received including the jurisdiction of <br /> origin, origin of potential alternative daily cover material (only for the C&D fines), <br /> and the total tons of solid waste exported from each jurisdiction of origin. This I <br /> information is kept bn file in the administrative office under the supervision of the <br /> Site Manager. <br /> Article 6.35 Additional Oi)eratln-q Requirements for Facilities Onl <br /> f �I <br /> J Communications Equipment [14 CCR 17415.1] <br /> II. <br /> Telephone service, is provided by AT&T. Telephones are available in the <br /> administrative offices. The office staff and the key employees on site utilize a <br /> private radio network to communicate and coordinate their daily and routine <br /> operating-practices�' <br /> Firefighting Equipment [14 CCR 17415.2] <br /> Onsite processing buildings are designed and constructed with appropriate fire <br /> control equipment, which may include sprinklers, fire extinguishers, or other <br /> requirements. <br /> The operator maintains several hydrants disbursed throughout the facility, as part <br /> of the onsite water supply and fire suppression system, which includes a 150,000 <br /> gallon water tank (fed by onsite wells) and pressurization equipment. Fire hoses, <br /> also used onsite for, dust suppression purposes, are available to suppress small <br /> fires, should they occur. Process water used for dust or fire control or other <br /> operational requirements, and will be minimized only to what is necessary. <br /> : Surface water runoff, including all process water and potential fire flow, is <br /> directed to onsite retention basins by use of drain pipes, grading design, and <br /> drainage ditches, where it is properly treated, if necessary, to eliminate potential <br /> environmental impacts. <br /> Front-end loaders and excavator are available to aid in the management of <br /> materials to combat fire or prevent its spread. All firefighting equipment is <br /> properly maintained IBand available on a continuous basis. <br /> � <br />' The facility operates under a fire prevention plan which has been developed in <br /> coordination with the Tracy Fire Department. <br /> I <br /> 26 170.18 CDI FacReport 121907.doc <br /> i <br /> I <br />