Laserfiche WebLink
it <br /> Project Description —Construction &Demolition/Inert Debris Facility Report <br /> Trary Material Recovery Facility and Transfer Station <br /> i 30703 S. MacArthur Drive, Tracy, California 95377 <br /> Facility Operations Unusual Peak Loading Operations Plan <br /> �N <br /> C&D Processing Phase 1 operations at 500 TPD, with a floor sort, <br /> can be processed manually at 20-30 tons per <br /> hour. <br /> f i Phase 2 operations at 500 TPD with processing <br /> capacity of 15 tons per hour (TPH) on pre-sort, <br /> # and 30 TPH on the C&D Processing Line, <br /> provides a capacity of 45 tons per hour, or 540 <br /> 'E TPD, where a' peak of 500 TPD is being <br /> permitted. <br /> Emergency Waiver of An emergency waiver of standards is a waiver issued <br /> Standards by the LEA which grants a solid waste facility operator <br /> p temporary relief from specific state minimum standards <br /> I or specific terms or conditions of a solid waste facility <br /> permit. Unusual peak loading could be handled by the <br /> facility during an Emergency Waiver of Standards, in <br /> the event a state of emergency is declared by the <br /> i Governor. The waiver will not pose a threat to public <br /> health, safety or the environment. The operator intends <br /> to operator within the nuisance control measures <br /> outlined in Title 14 and provided in LEA Advisory No. <br /> 41 dated July 14, 1997. <br /> { Equipment Type an`d Classification <br /> The description of the transfer, recovery and processing equipment, including <br /> } classification and capacity is provided below. The equipment on-site is provided <br /> in Tables 15 and 16 M <br /> Table 1�5 - Inert (Type A) inert Processing Equipment <br /> f � <br /> Machinery 11 Machine Production Rate <br /> Portable HSI Lippeman Milwaukee Jaw Plant, 250 <br /> 3- deck Cedar Rapid screen, electric (or Tons/Hour <br /> similar) <br /> �M <br /> t <br /> { <br /> i <br /> S_ <br /> 32 170.18 CDf FacReport 921907.doc � <br />