My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006921
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
PA-0800005
>
SU0006921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:48 AM
Creation date
9/6/2019 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006921
PE
2627
FACILITY_NAME
PA-0800005
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313019 26
ENTERED_DATE
1/24/2008 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
RECEIVED_DATE
1/11/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\APPL.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH COND.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93.1/UP-93-4 <br /> Page 10 <br /> C. The tipping floor area and transfer trailers-Shap be cleaned daily. Transfer trailers_shall <br /> be periodically steam cleaned to remove accumulated grease and dirt. <br /> 3. MEN=OF FISH AN <br /> a. In carrying out the operations of the project, the applicant shall take no aeons that <br /> violate the provisions of the_;atate or Federal Vie"Species.Acts or any regulations <br /> P ustrartt thereto. Coulpliande with said laws shall be the sole responsibility <br /> of the appl'rc M and the applicant shall agree to indemnify, defend,and hold the County. <br /> harmiess from and against any claim or action by affected State or Federal agendas as <br /> to the project's compliance with said laws. <br /> b. Not more tharf 6D d$ys prior to construction,, a professional biologist retained by the <br /> appl6ait 44111 conduct a preconstn ,,sprvey of the sae for the presence of the San <br /> Joaquin kit F L If airy kit foxes are found,pre=Ajom specified in Chapter 4.2, Mitigation <br /> 4.2-4, shall be taken <br /> C. Not mons than So days prior.to. tion, lxo oral•biologist retained by the <br /> applicacl Shah conduct a preconstrrtioci ttxvr of the site for the presence of Burrowing <br /> owls and avoid adverse impacts on Burrowing owls, if present, as specified in Chapter <br /> 4.2, Miligatien 4.2-6. <br /> 4. DEPARTMENT OF PUPUC WORKS. <br /> a. The driveway approaches with a,right-turn lane at the rtath entrance shall be improved <br /> In accordance with the requirements of San Joaquin County Standards R-17 and R-27 <br /> prior to issuance of the occupancy permit. (Development TWO Section 9-1145.5) <br /> b. Dedicate a 42-foot-wide right-of-way from the centerline of MacArthur Drive to the property <br /> line along tha frontage d'APN 253-130-19. (Development Tithe Section 9-1150.2) <br /> C. MacArthur Drive from the south driveway,to Urine Road shall be upgraded structurally to <br /> provide for the difference between the present Traffic Index and the Traffic Index for the <br /> proposed development. The upgrade shall..be constructed in conformance with the <br /> Improvement 'Standards and. Sp, ons of the County of San Joaquin. All <br /> improvemeritplans andspea Dons must be approved by the County of San Joaquin <br /> Department of Public Works prior to approval of the Improvement Plan. (Development <br /> Title Section 9-1150.2) <br /> d. An encroachment permit shall be required for work within the road right-of-way. <br /> f. <br /> (Development Title Section 9-1145.2) <br /> The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable prior to the time of building permpt;appkatk n Eighty percent of the fee <br /> may be deferred over a period not to exceed five years by entering into a Deferred Traffic <br /> J) Impact Mitigation Fee Payrrmm Agreement with the County. If deterred, the initial <br /> payment 19.20 percent of the total fee based on $249.99 per daily trip-end generated in <br />
The URL can be used to link to this page
Your browser does not support the video tag.