Laserfiche WebLink
Parrelra Almond Processing Company <br /> N-1082706, N-1337-",2-7,6-1,7-0, 8-0 <br /> IX. Recommendation <br /> Compliance with all applicable rules and regulations Is expected. Issue Authorities to Construct <br /> N-1337-1-6, N-1337-2-7, N-1337-0-1, N-1337-7-0, and N-133748-0 subject to the permit <br /> conditions on the attached draft Authorities to Construct Included in Appendix A. <br /> X. Billing Informadon <br /> BUIlng inky mation <br /> Permit Number Fee Schedule Pro-Project Description Post-Project Descrion <br /> N-1337-1-6 3020-01-F 422 hp 422 h i <br /> N-1337-2-7 3020-01-G 1203.24 hp 1203.24 h <br /> N-1337-6-1 3020-01-D 112.8 hp 112.8 h <br /> N-1337-7-0 3020-08A-A I NIA520 k1N electrical generation <br /> N-1337-8-0 999-89 N/A No-applicable fixe <br /> Appendices <br /> Appendix A: Draft Authority to Construct <br /> Appendix B: Process Diagram <br /> Appendix C: Health Risk Assessment <br /> Appendix D: Syngas Analysis <br /> Appendix E: BACT Guideline and BACT Analysis <br /> Appendix F: QNEC Calculations <br /> Appendix G: Emission Profile <br /> Appendix H: NO.Emissions Research <br /> Appendix I: YSAQMD Source Test Report <br /> { <br /> I r <br /> 1 <br /> 10 Pursuant to ACM-1145, Billing Policy, Schedule 7(Resource Recovery), Scâ–ºredu/9 8(Eechic GeneraiionJ, <br /> equipment associated with an electrical generation operation,but which are not the combustion units used to <br /> generate the elecbicity, shall not be assessed any additional fees.The flare is a safety devir;e associated with the if <br /> electrical generating system permitted under ATC N-1337-7-0, so no fees aro required for the fare. <br /> 31 <br />