INFORMATION SHEET <br /> ORDER NO. R5-2002-0072 <br /> GEORGE REED, INC. AND 711 MATERIALS, INC. <br /> AGGREGATE MINE AND WASTEWATER SYSTEM <br /> SAN JOAQUIN COUNTY <br /> George Reed, Inc. owns and operates the aggregate processing facility at 17300 E. Jahunt Road, <br /> Clements, San Joaquin County. George Reed processes earth materials excavated in the nearby area. <br /> Presently, the excavations are located south of the Mokelumne River. A gold dredge mined the area in <br /> the 1930's. Excavation of earth materials has occurred since at least 1956. George Reed, Inc. has <br /> owned the facility since 1993. George Reed, hie. also operates an asphaltic concrete batch plant at the <br /> site. 711 Materials, Inc. operates a concrete batch plant. <br /> George Reed, Inc. expects to produce approximately 500,000 tons of aggregate per year. Excavated <br /> materials are washed to remove fine grained soil particles. Approximately 475,000 gallons of <br /> aggregate washing wastewater is generated on a daily basis. Aggregate washing water comes from a <br /> groundwater well located at the aggregate plant. Most of the water is recycled for uses such as dust <br /> control,not for aggregate washing. <br /> The wastewater is discharged to settling ponds that are not protected from a 100-year flood. George <br /> Reed, Inc. has proposed a plan to install mechanical separation equipment and construction of primary <br /> settling ponds or a mechanical treatment system that would eliminate wastewater settling ponds. If the <br /> primary settling ponds are constructed,effluent from the settling ponds is required to have a lower <br /> sediment load then floodwaters in the Mokelumne River. As part of the wastewater system <br /> improvements, George Reed, Inc. is proposing to discharge wastewater into an existing pond(called <br /> Pond A). To allow construction of the mechanical settling equipment and primary settling ponds, <br /> wastewater would be discharged into Pond A would be without treatment. The Order requires the <br /> mechanical equipment and primary settling ponds to be constructed and in operation by December <br /> 2002. This Order requires evaluation of Pond A to determine if additional permits from other <br /> governmental organizations are required prior to initiating the discharge. <br /> Groundwater occurs approximately 15-20 feet below the ground surface depending on surface <br /> elevation and proximity to the Mokelumne River. No groundwater monitoring wells exist on the <br /> property, although there are two industrial process supply wells. This Order does not require <br /> groundwater monitoring because chemicals are not added to the wastewater and because of the low <br /> likelihood of the discharge impacting groundwater quality. This Order does require evaluation of the <br /> concrete batch plant containment structure and an analysis to determine if soluble metals (especially <br /> hexavalent chromium) exist in concentrations that would result in classification of the wastewater as <br /> designated waste. <br /> The surrounding land uses are industrial and agricultural. <br /> TRO: 4/26/02 <br /> c ti+r o�mmw,d.!aarimw w.aw <br />