Laserfiche WebLink
End Use <br /> The Reclamation Plan requires that all disturbed lands shall be returned to previous farming capability. The <br /> applicant plans to plant walnut orchards. Reclamation will be continuous and concurrent with mining. <br /> Topsoil will be replaced concurrent with mining,and the orchard will be planted in approximately 20-acre <br /> increments. New plantings will be maintained and monitored by the ownerloperatorand a farm contractor. <br /> San Joaquin County QX-99-2\Reed <br /> Community Development Page 5 <br />