My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004113
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23405
>
2600 - Land Use Program
>
QX-99-0002
>
SU0004113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 11:19:21 AM
Creation date
9/6/2019 9:56:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004113
FACILITY_NAME
QX-99-0002
STREET_NUMBER
23405
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
23405 N MACKVILLE RD
RECEIVED_DATE
10/26/1999 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23405\QX-99-02\SU0004113\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions <br /> Quarry Excavation Application No. QX-99-2 was approved by the Planning Commission on _ <br /> The effective date of approval is _. This approval will expire on which is 18 months from <br /> the date of approval,unless(1) all Conditions of Approval have been complied with, (2)all necessary <br /> building permits have been secured and remain in force, and (3) all necessary permits from other <br /> agencies have been secured and remain in force. <br /> Unless otherwise specified,all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified; and, other ordinance requirements may <br /> apply- <br /> 1. <br /> pply1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact:Tina Wehrmeister,468-8477) <br /> a. APPROVAL: This approval shall be for a phased 12-year excavation of the 69.5-acre portion of the <br /> 79-acre project site, as shown on the approved Mining and Reclamation Plan dated April 7, 1999. <br /> The Reclamation Plan text is attached as Exhibit A. <br /> b. IMPROVEMENT PLAN: The Improvement Plan shall be prepared by a registered Civil Engineer <br /> and show drainage,driveway access details, on-site parking, existing and proposed utility services, <br /> grading, and reclamation. A Plan Check fee as specified by Section 9-240 will be required. The <br /> Mining and Reclamation Plan shall be prepared in accordance with the reclamation standards <br /> developed pursuant to the Surface Mining and Reclamation Act (SMARA) Section 2773(b) and <br /> approved by all agencieswith permit authority priorto initiating the use. <br /> c. STOCKPILING: No stockpiled soil or material shall be placed closer than twenty-five(25) feet to a <br /> property boundary.(Development Title Section 9-1415.3[b]) <br /> d. PRIVATE ROADS: All private roads involved in an excavation shall be maintained so as to control <br /> the creation of dust. The first one hundred (100) feet of any private road on the property which <br /> intersects with a publicly maintained road shall be surfaced in a manner approved by the Director. <br /> Traffic-control and warning signs shall be installed, if required, at such intersection. The placement <br /> and size of these signs shall be approved by the Director of Public Works. (Development Title <br /> Section 9-1415.3(c]) <br /> e. EROSION CONTROL: Protective vegetative planting,silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development <br /> Title Section 9-1415.3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> (1) All equipment used at the site will be equipped with state-of-the-art noise shielding and muffling <br /> devices to minimize noise from the operation of the equipment. <br /> g. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours from 5:00 <br /> a.m.to 9:00 p.m.(Development Title Section 9-1415.3[f]) <br /> San Joaquin County QX-99-2\Reed <br /> Community Development Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.