My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010285
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23627
>
2600 - Land Use Program
>
QX-99-0002
>
SU0010285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:29 AM
Creation date
9/6/2019 9:57:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010285
PE
2656
FACILITY_NAME
QX-99-0002
STREET_NUMBER
23627
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
APN
01922043 44
ENTERED_DATE
11/4/2014 12:00:00 AM
SITE_LOCATION
23627 N MACKVILLE RD
RECEIVED_DATE
11/3/2014 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23627\QX-99-0002\SU0010285\APPL.PDF \MIGRATIONS\M\MACKVILLE\23627\QX-99-0002\SU0010285\CDD OK.PDF \MIGRATIONS\M\MACKVILLE\23627\QX-99-0002\SU0010285\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN-QX-99-02 <br /> George Reed,Inc. <br /> Page Four <br /> C. MINING PLAN: <br /> 1. Operating Plan: Excavation will commence upon obtaining a permit and will <br /> terminate with total reclamation within X17 ears, dependent upon demand for <br /> materials. Excavation occurs approximately 180 days in a year. Weather and <br /> demand for materials can alter this approximation. Excavation activity generally <br /> occurs between March-October each year. Excavation will be limited to a <br /> weekly schedule of Monday-Friday, 6:00 a.m. to 6:00 p.m., except during <br /> periods of declared national, state, or county emergency or inclement weather. <br /> Archaeological finds, if there are any,will be evaluated by a Qualified <br /> Archaeologist with notification to the Planning Division. <br /> 2 & 3. Topsoil/Overburden: Topsoil/Overburden is stripped, set aside <br /> temporarily,then replaced concurrent with excavation. There will be no <br /> stockpiles. Excavation is by the open pit method commencing at the South/West <br /> corner of Phase I, moving in an Easterly direction; then returning in a West to <br /> East direction. Excavation depths will be 30'+/-. Overburden ranges in depth <br /> from 0' -15'with sand and gravel depths of 10'-15'. Equipment to be used at the <br /> project site consists of scrapers/dozers to remove overburden, backhoe/excavator <br /> to remove sand and gravel, trucks to transport materials to the existing <br /> processing facility on the Northside of the Mokelumne River. A motorgrader <br /> and scraper will be used to level and contour site for final reclamation. Water <br /> truck is used to spread water within the project area for dust control. <br /> 4. Mine Waste: Sand and Gravel will be processed at the existing processing plant <br /> located on the Northside of the Mokelumne River which operates under Waste <br /> Discharge Order 93-177 for wash water discharged to the existing sedimentation <br /> and recycling pond. There will be no waste discharge due to the excavation <br /> under this permit/reclamation plan. All materials will be either processed or <br /> used for reclamation. <br /> E. SIZE: <br /> 1. Total acreage to be permitted: 78.5 Acres <br /> 2. Total acreage to be disturbed: 69.5 Acres <br /> 3. Total acreage to be reclaimed: 73.0+/-Acres <br /> F. Water Requirements: The only water required for the project is used for dust <br /> suppressant at the excavation site/roads during the removal and transporting of sand <br /> and gravel to the processing plant. Water is obtained from the fresh water pond or <br /> well if necessary, located at the processing plant. <br />