Laserfiche WebLink
MOUNTAICUSE TOWN CENTER INITIAL STUDY APF WADI%A <br /> MOUNTAIN HOUSE MASTER PLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> Person/ Timing or <br /> Monitoring Agency Frequency of <br /> Impact' Mitigation Measure Requirements Res onsiblez Monitorin <br /> Many of the mitigation measures from the Final Environmental Impact Report have been incorporated into the Master Plan,Master Plan Appendices,Specific Plan I,and Public <br /> Financing Plan. Some mitigation measures have been included as Amendments to the San Joaquin County General Plan and/or the Mountain House Development Title. <br /> Compliance with these mitigation measures will occur as a function of the Implementation of these various plans. <br /> WATER SUPPLY <br /> M4.4.1-1 a)If potential or proposed restrictions on diversion would cause the Review of SJCDPW SP <br /> Inadequate raw water storage facilities confirmed water supply to be insufficient to serve the project as proposed Subsequent <br /> may result in interruption of water in the Master Plan,then the specific plans shall identify additional water Speck Plans. <br /> service, especially if restrictions on conservation/reuse measures to be incorporated into the project to ensure <br /> water diversion were imposed by State that the demand would not exceed the confirmed supply. <br /> or Federal a encles. <br /> M4.4.1-5 a)Industrial reuse of water treatment sludge shall be practiced to the Plan review. MHCSD, DP for water <br /> Water treatment sludge disposal could maximum extent possible.The Community Service District shall consider SJCDPW treatment plant <br /> adversely impact local water quality or other disposal options only 1f industrial reuse were infeasible. <br /> unnecessarily occupy scarce landfill <br /> space. <br /> M4.4.1-6 a)Chemical Selection and Facilities. Prior to the plants,chemicals Review MHCSD, DPs for water <br /> An uncontrolled release of hazardous associated with water and wastewater treatment operations shall be Plan/Engineers SJCDPW and waste- <br /> materials associated with water carefully selected to minimize the hazard.Chemical handling and storage Report water treatment <br /> treatment practices could potentially facilities shall be designed to minimize and effectively mitigate the potential plants <br /> occur and impact water resources and for accidental releases,including such features as secondary containment, <br /> public health. alarms,remote sensing instruments,and other safety features. <br /> WASTEWATER <br /> M4.4.2.1 a)Additional wastewater treatment processes shall be provided if Plan review. SJCDPW SP <br /> Inadequately treated reclaimed unrestricted use reclamation,including irrigation on-site, <br /> wastewater could impact local surface Industrial/commercial reuse,or surface water discharge were <br /> and groundwaters and public health. implemented. <br /> Insufficient reclamation sites could b)The permit application for the wastewater treatment plant shall include a Review SJCDPW DP for <br /> result in illegal and inappropriate schedule for design,construction,and permitting for the plant to ensure Development treatment plant <br /> discharge of treated wastewater. that the wastewater treatment and reclamation facilities would be Permit <br /> operational prior to the approval of the first final subdivision map. application. <br /> c)Each Development Permit for the wastewater treatment plant shall Review SJCDPW DP for <br /> describe the mechanism by which the construction of additional facilities Development treatment plant <br /> for incremental expansion in treatment capacity shall be completed before Permit <br /> the existing capacity is exceeded. application. <br /> tnnsroal A-3 <br />