Laserfiche WebLink
MOUNTAM HOUSE TOWN CENTER INITIAL STUDY APPENDIX A <br /> MOUNTAIN HOUSE MASTER PLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> Person/ Timing or <br /> Monitoring Agency . Frequency of <br /> Impact' Mitigation Measure R uirements Res onsible2 Monitorin 7 <br /> g)The location and design specifications for the wastewater storage Review SJCDPW DP for <br /> ponds shall be provided in the Reclamation Plan.The location of reclamation plan. wastewater <br /> agricultural drains within a one-half mile radius of the storage ponds and treatment plant <br /> the sources and characteristics of soil that would be used to construct the <br /> ponds shall be identified.The design specifications shall address levee <br /> and pond bottom permeability,levee stability,and flood protection. <br /> h) An estimate shall be made of the wastewater volume that may seep Documentation CVRWQCB, DP for <br /> from the wastewater storage ponds,and an assessment of potential flow from CVRWQCB. SJCDPW wastewater <br /> paths from pond seepage shall be determined for the Interim and potential treatment plant <br /> permanent reclamation sites. The result of the assessment shall be <br /> submitted to the CVRWQCB for determination of whether agricultural drain <br /> discharge from land irrigated with reclaimed water would be regulated as a <br /> point-source discharge under the NPDES program. The determination by <br /> the CVRWQCB shall be provided in the reclamation plan. If it appears <br /> likely that the CVRWQCB would regulate the agricultural drain discharge, <br /> then assurance that the discharge would be allowed must be documented <br /> prior to approval of the reclamation plan. <br /> M4.4.2.3 a)Beneficial reuse of sewage sludge shall be implemented to the Review of plan. SJCDPW, SP <br /> An inadequate wastewater sludge maximum extent possible to minimize sludge disposal at a landfill or at a MHCSD <br /> treatment and disposal system could dedicated site. <br /> adversely impact water resources and b) Interim Disposal. If the sludge meets acceptance criteria of a specific Review SJCDPW SP <br /> public health. Scarce municipal landfill landfill,the sludge shall be initially disposed of at an appropriately documentation of <br /> space may be occupied by sludge if permitted landfill. Sludge shall meet nonhazardous classification and shall sludge disposal. <br /> alternative disposal/reuse options were be dried to a minimum of 50 percent solids prior to disposal at a landfill. <br /> not aggressively pursued. The duration of landfill disposal shall not exceed two years from the <br /> startup of the activated sludge treatment process,unless the sludge <br /> disposal program described in Implementation e)concludes that landfill <br /> disposal of wastewater sludge is the only viable option. <br /> (11H9/OB) A-c <br />