Laserfiche WebLink
MOUNT JUSE TOWN CENTER INITIAL STUDY APPENDIXA <br /> MOUNTAIN HOUSE MASTER PLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> Person/ Timing or <br /> Monitoring Agency Frequency of <br /> Impact' Mitigation Measure Re uirements Responsible 2 Monitoring 9 <br /> M4.11-5 a) The Mountain House Creek Planting and Restoration Measures Review of Final SJCCDD SPs along <br /> The project would block the movement contained in Appendix 7-A to the Master Plan, referred to in Creek Park Plan. Creek Plan, <br /> of most terrestrial species between the Implementations 1), n),dd),ee),and ff)for Objectives 3 and 4 of Parks and periodic <br /> eastern base of the Altamont Hills and Recreation section(Appendix C), should be expanded to include monitoring per <br /> the Delta-farmland region to the east. provisions for monitoring, replacement plantings,and re-evaluation of the Appendix 7-A <br /> restoration plan,similar to the provisions contained on pages 27-33 of the <br /> "Mountain House Creek Phase One Habitat Restoration Plan"(Zentner& <br /> Zentner, 1993c). <br /> M4.11-7 a) Unless detailed study demonstrates that the potential impacts of the Review of specific SJCCDD SP for marina <br /> Construction and operation of the proposed marina on biotic resources could be mitigated to a less-than- plan <br /> proposed 60-acre marina would impact significant level,elimination of the proposed 60-acre marina shall be Neighborhood K. <br /> the productive inshore zone and considered in favor of a boat launch ramp and day use parking lot for the <br /> riparian edge habitat of Old River. private use of the residents of the new community. <br /> b)Provisions should be included to minimize disturbance to fish and Review specific SJCCDD SP for marina <br /> wildlife habitat of Old River, prevent water quality degradation,and plan land use <br /> conduct further detailed surveys for special-status taxa as recommended map for Manna <br /> in Mitigation Measures 4.11-4a, b),and c). (Neighborhood <br /> K). <br /> c)To minimize On-site SJCCDD 0 <br /> disturbance to wildlife and riparian habitat along Old River,signs shall be inspection. <br /> posted along the length of the site fronting Old River, limiting boat speeds <br /> to 5 mph to prevent disturbance to wildlife and riparian habitat. <br /> TRANSPORTATION <br /> M4.123 a)Interchange improvements on 1-205 and on 1-580(west of 1-205 Preparation of SJCCDD PSR's for 1-205 <br /> The project would increase traffic junction)should provide for ramp metering with HOV bypass lanes. Project Study and 1-580 <br /> volumes on freeway interchanges near Reports. Interchanges <br /> the site and would require interchange <br /> improvements at Grant Line Road/1- <br /> 580, Patterson Pass Road/1-205 and <br /> Patterson Pass Road/1-580. <br /> (11/19108) A-11 <br />