Laserfiche WebLink
.. .. <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-04-70(SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $4216.00 per 1,000 gross square foot of <br /> building designated as Retail Service in the Stockton area. The fee shall be automatically adjusted July <br /> 1 of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (A credit may be allowed if it can be verified that the existing development on this site was in <br /> operation on or before April 23, 1990.) (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is <br /> due and payable prior to issuance of the building permit. (The fee currently is$569.00 per 1,000 gross <br /> square foot of building designated as Retail Service. The fee shall be automatically increased on <br /> January 1 of each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall <br /> require a State NPDES construction permit. <br /> DTP:DG:ar <br /> P-\COM WSSA\Y 20 VAAi 7Owpd <br />