Laserfiche WebLink
Conditions <br /> Use Permit Application No. UP-013 was approved by the Planning Commission on _. The <br /> effective date of approval is . This approval will expire on , which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force,and (3)all necessary permits from <br /> other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact:Jennifer Jolley,468-3161) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT." The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage,driveway access details(including gates), on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a seventy-five(75)unit mobile home park. Each unit contains <br /> an area of 3,780 square feet (42 x 90) and two (2) parking spaces. A 2,500-square-foot <br /> office/recreation hall and a 600-square-foot laundry room will also be constructed as shown on the <br /> Plan dated January 31, 2001. The existing single-family dwelling unit on the parcel will not be <br /> included as part of the mobile home park. (Use Type: Mobile Home Park) <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section7-1000of the County Ordinance Code) <br /> d. SETBACKS: Yards and setbacks for the mobile home park shall be as follows: <br /> (1) Front yard setback is a minimum of twenty(20)feet <br /> (2) Side yard setback is a minimum of five(5)feet <br /> (3) Rear yard setback is a minimum of twenty(20)feet,and; <br /> (4) Street side yard setback is a minimum of twenty (20) feet. (Development Title Section 9-9- <br /> 310.5) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust-free surface. Bumper guards shall be provided where <br /> necessaryto protect adjacent structures or properties.(DevelopmentTitle Section 9-1015.5[e)) <br /> San Joaquin County UP-01-3\Rolleri <br /> Community Development Page 8 <br />