Laserfiche WebLink
4 <br /> s <br /> • If the Board of Supervisors approves the General Plan <br /> Amendment, then this Zone Reclassification would be <br /> consistent with the General Plan. There are no applicable <br /> Master Plans or Specific Plans in the vicinity. <br /> f 2. The proposed zone district is reasonable and beneficial at the time; <br /> • The applicant has submitted a market survey for this project <br /> that has been accepted by the Community Development <br /> Department. If the Board of Supervisors approves the General <br /> Plan Amendment, then this Zone Reclassification would be <br /> reasonable and beneficial. <br /> i <br /> Service Requirements <br /> Both the General Plan and Development Title contain the following requirements <br /> for the provision of services. When an underlying project is processed it will be <br /> subject to the following service requirements. <br /> 1. Wastewater Treatment : In Freeway Service Areas outside of . <br /> communities, a public wastewater system for at least each side.of the <br /> freeway_. (General Plan, Volume I, pg. IV-103) A wastewater disposal <br /> system:serving only one existing parcel may be privately owned and <br /> operated until additional parcels are served; then it shall become a public <br /> wastewater disposal system. ( Development Title Section 9-1105.7) <br /> 2. Water Supply: In Freeway Service Areas outside of communities, a public <br /> water system serving at least each side of the freeway. (General Plan, <br /> Volume I, pg. IV-105) A water system serving only one existing parcel <br /> may be privately owned and operated until additional parcels are served; <br /> then it shall become a public water system. (Development Title Section 9- <br /> 1120.7) . <br /> 3. Stormwater Drainage: In Freeway Service Areas outside of communities, <br /> a public drainage system serving at least each side of the freeway. <br /> (General Plan, Volume 'I, pg. IV-109) In Freeway Service areas outside of <br /> urban communities, development projects served by a public drainage <br /> system planned for the entire freeway service area or one side of the <br /> jfreeway which discharges into a terminal drain is required except as <br /> follows: <br /> A. Agency Retention Basins. The public drainage system may.discharge <br /> into.a retention basin where all of the following exist: <br /> 1) There are'no terminal drainage facilities within one thousand (1000) <br /> feet and; <br /> I 4 <br /> i <br />