Laserfiche WebLink
9-1105.1 <br /> CHAPTER 9.1105 confirmation shall be given by the agency providing the <br /> services. For on-site systems, this confirmation shall be <br /> WASTEWATER DISPOSAL given by the Environmental Health Division. <br /> (d) Suitability of an Area for Septic Tank Usage. <br /> Sections: The suitability of an area proposed for septic tank usage <br /> 9-1105.1 Intent shall be determined prior to submission of a General Plan <br /> 9-1105.2 General Requirements. Amendment or Zone Reclassification application, the <br /> 9-11053 Urban Communities. approval of a parcel or final map, or the issuance of a <br /> 9-1105.4 Rural Communities. building permit for other development project applica- <br /> 9.1105.5 Industrial Areas Outside of tions.The suitability shall be determined by the Environ- <br /> Urban Communities. mental Health Division in accordance with the following <br /> 9-1105.6 Warehouse Industrial and Truck criteria: <br /> Terminal Zoning Districts. (1) The intensity and extent of the existing and the <br /> 9.1105.7 Freeway Service Areas Outside proposed development project's use of septic tanks within <br /> of Urban Communities. and around the area; <br /> 9-1105.8 Commercial Recreation Areas (2) The suitability of the soil for utilizing septic <br /> Outside of Urban Communities. systems, including percolation rates and soil profiles; <br /> 9-1105.9 Agricultural Areas. (3) The depth and gradient of the water table; <br /> 9-1105.10 Agriculture-Urban Reserve (4) The history of past uses in the project area to <br /> Zoning District. assess potential problems; <br /> 9-1105.11 Subdivision of Existing (5) Other information as required by the Environ- <br /> Developed Properties. mental Health Division to determine the cumulative effect <br /> 9.1105.12 Antiquated Subdivisions. of the existing and the proposed development project on <br /> 9.1105.13 Expansion Capability of groundwater contamination; and <br /> Wastewater Treatment (6) In non-agricultural zones, septic systems will <br /> only be considered for parcels two (2) acres or more in <br /> 9-1105.1 INTENT. size, except in areas zoned Rural Residential, where <br /> The intent of this Chapter is to specify the require- parcels one (1) acre or more in size will be considered <br /> ments for wastewater service and wastewater disposal for if served by a public water system and public storm <br /> development projects. drainage system.Other requirements of this Chapter must <br /> (Ord. 3675, 3756) still be met. <br /> (e) Mandatory Connection Within Two Hundred <br /> 9.1105.2 GENERAL REQUIREMENTS. Feet. Any expansion of an existing use on an existing <br /> The following general requirements for wastewater parcel shall require the project to be served by a public <br /> disposal shall apply to all development projects, unless wastewater disposal system if: <br /> otherwise specified in this Title: (1) The expanded use generates additional <br /> (a) Compliance with Environmental Health Division wastewater, and <br /> and Agency Requirements. Private on-site wastewater (2) The sewer main is within two hundred feet(200') <br /> disposal shall comply with the requirements in Chapter of the nearest building. <br /> 9-1110 and the Environmental Health Division. Any (3) Exceptions may be granted if the project site <br /> public wastewater disposal system shall comply with the meets the requirement for on-site wastewater disposal <br /> requirements of the Public Works Department, the Envi- specified in Section 9-1105.2(d), and: <br /> ronmental Health Division, or the agency providing (A) The Director of Public Works determines that the <br /> wastewater disposal services. existing system has no capacity; <br /> (b) Wastewater Service by Agency. Development (B) The Parcel cannot be annexed to the existing <br /> projects requiring wastewater service by a public agency sewer district; or <br /> shall be served by a public wastewater disposal system (C) The parcel is outside of a County maintained <br /> and wastewater treatment plant. sewer district where no health hazard exists. <br /> (c) Written Confirmation for Building Permits. (f) Extension of Sewer Main. When the Director of <br /> Applications for building permits shall include written Public Works determines that extension of the sewer P <br /> confirmation that the development project meets the main through a project or along a project parcel frontage <br /> requirements of this chapter. For public systems, this is necessary for the orderly provision of wastewater <br /> 2 <br /> 525 <br />