Laserfiche WebLink
` P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> THOMAS T FLINN STOCKTON,CALIFORNIA 95201 <br /> �`` �*'• DIRECTOR ,L^l "1,'h (209)468-3000 FAX(209)468-2999 <br /> 6n { www.sjgov.org/pubworks <br /> THOMAS M.GAU 5,, <br /> CHIEF DEPUTY DIRECTOR ^}J "I <br /> MANUEL SOLORIO Works for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR RECEIVED <br /> November 26,2007 NOV 2 7 2007 <br /> Community Devefopn"nt Dept. <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Jason Jones <br /> FROM: Bill DuBois, Engineering III <br /> Public Services Division <br /> SUBJECT: PA-07-473 A SITE APPROVAL APPLICATION TO BUILD A 2,000 SQUARE FOOT <br /> DETACHED GARAGE FOR FIRE TRUCKS FOR AN EXISTING FIRE HOUSE, LOCATED ON <br /> THE NORTH SIDE OF MARIPOSA ROAD,650 FEET WEST OF JACK TONE ROAD. <br /> (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Collegeville Fire District <br /> ADDRESS: 13225 E. Mariposa Road APN: 181-080-06 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Mariposa Road has an existing right-of-way width of 80-feet and a planned right-of-way width of 110-feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. Any new driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $2,145.00 per 1.000 gross square foot of building <br /> designated as office in the Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.)(Resolution R-00-433) <br /> 4. The Regional Traffic Impact Fee may be required for this development. The fee is due and payable at the time <br /> of building permit application. The fee currently is $1,390.00 per 1000 gross square foot of building. The fee <br /> is based on the current schedule. (Resolution R-06-38) <br />