Laserfiche WebLink
Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-07473 (SA) <br /> 5. The Water Supply Facilities Impact Mitigation Fee may be required for this development. The fee is due and <br /> payable prior to issuance of the building permit. The fee currently is$653.00 per 1,000 gross square foot of <br /> building designated as office. The fee shall be automatically increased on January 1 of each year through the <br /> year 2015 at the rate of 4.55 percent.(Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 <br /> and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 8. Drainage from the improved portion of the parcel shall be retained on-site by a retention basin (18-inch <br /> maximum depth without the County Standard fence around the pond). Drainage for pond shall be calculated <br /> by a registered civil engineer, an architect, or a licensed contractor, prior to issuance of the building Permit. <br /> (Development Title Section9-1135.9) <br /> BD:SH:av <br /> PACOMMENTS\SAWR 2007\PA-0700473 APPLICATION.doc <br />