Laserfiche WebLink
Rick Griffin <br /> December 3, 2004 <br /> Page 2 of 2 <br /> 4. The owner/developer should dedicate as needed within the limits of the project to <br /> provide an 80' roadway section (40' half section) on Mariposa Road. Frontage <br /> improvements including, but not limited to, curb, gutter, sidewalk, driveway <br /> installation, pavement widening and street lighting should be installed prior to <br /> occupancy of any new buildings/structures on this site. Should installation of these <br /> improvements prove not practical due to existing physical constraints, the <br /> owner/developer should enter into, and record, a Deferred Improvement Agreement <br /> whereby the owner/developer agrees to install the required improvements at such <br /> time as it is practical. <br /> 5. All off-site improvements shall conform to City of Stockton Standard Plans and <br /> Specifications. <br /> We appreciate the opportunity to comment on this application. <br /> JAMES B. GIOTTONINI <br /> PUBLIC WORKS DIRECTOR <br /> GREGG S. MEISSNER <br /> DEVELOPMENT SERVICES MANAGER <br /> GSM:dm <br /> cc: Thomas Gau, Deputy Public Works Director <br /> Usepmts 04 - PA-0400702 (SA) (4124 E. Mariposa Rd.) <br />