My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004433
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
4900
>
2600 - Land Use Program
>
SA-01-51
>
SU0004433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:47 AM
Creation date
9/6/2019 10:07:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004433
PE
2632
FACILITY_NAME
SA-01-51
STREET_NUMBER
4900
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
5/19/2004 12:00:00 AM
SITE_LOCATION
4900 E MARIPOSA RD
RECEIVED_DATE
6/26/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\4900\SA-01-51\SU0004433\APPL.PDF \MIGRATIONS\M\MARIPOSA\4900\SA-01-51\SU0004433\CDD OK.PDF \MIGRATIONS\M\MARIPOSA\4900\SA-01-51\SU0004433\EH COND.PDF \MIGRATIONS\M\MARIPOSA\4900\SA-01-51\SU0004433\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- . <br /> COMMENTS TO DEVELODMENT <br /> SA-01-51 <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $680.00 per <br /> 1,000 gross square foot of building designated as manufacturing in the Stockton area. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) A credit may <br /> be allowed if it can be verified that the existing development on this site was in operation <br /> on or after April 23, '1990. <br /> (Resolution R-00-433) <br /> 5 The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee currently is <br /> $184.00 per 1,000 g-oss square foot of building designated as manufacturing. The fee <br /> shall be automatically increased on January 1 of each year through the year 2005 at the <br /> rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 6 A copy of the Final rite Plan shall be submitted prior to release of building permit. <br /> 7 Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site 'Ian is required upon submittal of verification <br /> 8. Any new or substantially improved structures shall conform to FEMA requirements. <br /> GK:SH:mr <br /> PS-1Gl0 -M1A <br />
The URL can be used to link to this page
Your browser does not support the video tag.