Laserfiche WebLink
12 September 2003 <br /> AGE-NC Project No. 03-1028 (addendum) <br /> Page 4 of 4 <br /> The Phase I site reconnaissance for AGE was conducted by Suzanne W. Henderson and Paul B. ✓ <br /> Dotson (Project Geologist) and the interview was conducted by Ms. Henderson. <br /> Item 4, Checklist Section 5.2 <br /> Figure 3 is missing from the report. <br /> AGE erroneously reported that a parcel map was provided on Figure 3. There was no Figure 3, the // <br /> parcel maps were provided on Figures 2A and 2B. <br /> Item 5, Checklist Section 5.3 <br /> An original signature and stamp of the REA is required. ✓ <br /> Mr.Rishwain submitted a Phase I xerox copy,with a copied signature page.Original signature pages <br /> are provided for both the Phase I report and this addendum. <br /> Advanced GwEnvironmental,Inc. <br />