Laserfiche WebLink
may also apply. Ordinance Requirements cannot be modified. <br /> d. An Improvement Plan showing drainage, driveway access <br /> details, on-site parking, existing and proposed utility <br /> services, and grading shall be submitted to the <br /> Department of Public Works for approval. Storm drainage <br /> shall be retained on the site, and provisions shall be <br /> shown on the Improvement Plan. <br /> e. The Traffic Impact Mitigation Fee will be required for <br /> this development. The fee is due and payable at the time <br /> of building permit application. The fee currently is <br /> $1, 397. 00 per 1, 000 gross square feet of building <br /> designated as "Service Commercial" in the Escalon area. <br /> The fee shall be automatically adjusted annually by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. <br /> f. An encroachment permit shall be required for work within <br /> the road right-of-way. <br /> 3 . PUBLIC HEALTH SERVICES: <br /> Ordinance Requirements: <br /> The Ordinance Requirements listed below have been identified <br /> as pertinent to this project. Other Ordinance Requirements <br /> may also apply. Ordinance Requirements cannot be modified. <br /> a. Provide permanent toilet facilities for the public and <br /> employees. Portable chemical toilets could be used for <br /> shows where the permanent facilities would not be <br /> adequate for the number of people in attendance. <br /> b. State on revised plans or improvement plans the maximum <br /> number of employees the sewage disposal system is being <br /> designed for and that the leach field area will be <br /> barricaded so that it cannot be driven over, parked on, <br /> or used as a storage area. This leach field area must be <br /> used for that specific purpose only and cannot contain <br /> any underground utility lines. <br /> C. Construct an individual sewage disposal system under a <br /> permit and inspection by the Environmental Health <br /> Division at the time of development. <br /> d. If a drinking fountain is installed, or the number of <br /> nonresident individuals exceed 24 for at least 60 days <br /> per year, or the number of service connections exceed <br /> four, a yearly permit to operate a public water system <br /> under the provisions of Title 22 , CCR, will be required <br /> Conditions of Approval - 3 - (UP-91-18) <br />