My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004117
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
10450
>
2600 - Land Use Program
>
QX-98-0002
>
SU0004117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 2:41:49 PM
Creation date
9/6/2019 10:08:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004117
PE
2656
FACILITY_NAME
QX-98-0002
STREET_NUMBER
10450
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
APN
13106001
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
10450 W MCDONALD RD
RECEIVED_DATE
3/8/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MCDONALD\10450\QX-98-02\SU0004117\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. LAND USE <br /> 1. The area to be excavated for the pond and habitat area was used for farming, <br /> even though at tunes crops were not hurve-AW dile to the extremely poor <br /> nature of the soil. With the pond and wildlife habitat area to be situated on <br /> this area there really would not be any lost farming ground of value. <br /> 1. AESTHETICS <br /> 1. The surrounding area is made up of medium and large agricultural ranches. <br /> There is little or no housing in this area. <br /> SCR1P-19ON O PROPOSED M11NING OPE RATIOT:: <br /> A. MAP OF OPERATIONS <br /> 1 See undated F,xcavatinn/Re.clamatinn Map dated July 17, 2002 <br /> B. PRODUCTION SCHEDULE <br /> 1. Due to excavating in water and having two islands in the pond an exact <br /> amount is unattainable, An estimation of 200,000 thousand cubic yards <br /> I d t a 1 d r n0 non t: a <br /> evua t�. used'wit a a remove of f v �wv cubic yard's per year. <br /> C. MINING PLAN <br /> 1. Operating and Closure Plan: The removal of the sand and completion of <br /> pVlld <br /> and habitat ar\•a JLLnuld Vti all comp VXWd by d', m4. the <br /> excavation will be open on a Monday to Saturday year-round basis. <br /> D. MINING OPERATION AND CLOSURE <br /> 1. Tl-.e actual beginning of the excavation would take place soon aoCr .he <br /> revision approval. Removal should be cornpleted by the end of December <br /> 204. The project will remain open year-round depending on the winter <br /> conditions, but most of material to be removed during spring and summer. <br /> I At the end of year 10A4. <br /> 3. Although removal of the sand material is to take place upon the approval <br /> of the revised original plan, the foliage and other natural growth take will <br /> take place on the outer edges and habitat area during the sand removal. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.