Laserfiche WebLink
4. Again, nature will take its course in revegatating the outer areas during this <br /> time-period, as well as trees that are to be planted. <br /> L. TOFSO;. <br /> 1. The small amount of topsoil that was spread across the top of the proposed <br /> pond area from the prior excavation will be used to form and top the two <br /> small islands inside the pond that are to be used for waterfowl reproduction <br /> and habitat area along south iuu of pond. <br /> 2. No topsoil is to be stockpiled. <br /> 3. The island areas and habitat areas will be protected from erosion due to the <br /> natural growth of brushcs, grasses and other growth. <br /> F. OVERBURDEN/WASTE ORE <br /> 1. The operation is an open pit type and there is no waste material of any type. <br /> 2. A Caterpillar wheel loader will load the trucks. A excavator will be used to <br /> remove the sand and at the same time excavate and create the pond. A <br /> thirty-eight hundred_gallon water truck will water down the short haul road. <br /> A small portable sand screen will be.used if needed. <br /> 3. No explosives will be used at this site. <br /> 4. There is no overburden on this project. <br /> 5. The maxum depth of the deepest point will be twci-;i fact. <br /> 6. There will not be any benches or tiers used for this project. <br /> Pond to be one level. <br /> I f�rpjwt til 1'ia.d01- iii vnc phase with final completion of au removal and <br /> wetlands habitat to be completed by end of 2004. <br /> G. MINE WASTE <br /> 1. There will not be any vraste material from this project. <br /> 2. Total acreage 11.25 <br /> 3. Total acreage to be disturhed 11.25 <br /> 4. Total acreage to be reclaimed 11.25 <br /> 3 <br />