Laserfiche WebLink
RECLAMATION PLAN PAGE THREE <br /> leveling in mid October to late October of this year. When areas are <br /> finished they will be leveled also and the topsoil replaced over the <br /> excavated area and this mainly depends when the existing crop is <br /> harvested and the ground is available. <br /> 4. MINE WASTE: There will be no waste material from this project. <br /> 1. Total acreage permitted: 114.1 acres <br /> 2. Total acreage to be disturbed: 114.1 acres <br /> 3. Total acreage to be reclaimed: 114.1 acres <br /> E. WATER REQUIREMENTS: <br /> I. Daily consumption of water to be between 7600 — 11,400 gallons <br /> per day during the summertime only. Fall and Spring 3800 gallon <br /> to 7600 gallons per day. No water usage in winter time. <br /> 2. Water is obtained from a self priming water siphon used for crop <br /> irrigation. The water source comes from trapper slough which is <br /> next to the project site. The existing water siphon has been located <br /> at present site for over forty years. <br /> F. CONTAMINANTS: <br /> 1. The only potential contaminant would be the diesel fuel that is put into <br /> the few pieces of equipment. <br /> G. WASTE WATER: <br /> 3. There will be no waste water,the only water used is for wetting the <br /> sand and haul road. <br /> H. WATER IMPOUNDMENTS AND DIVERSIONS: There will none needed <br /> for this project. <br /> I. ORE PROCESSING: <br /> 1. In one area of the site we would like to dry screen some blow sand. <br />